k`■ KLEINFELDER <br /> REVISED PROJECT COST ESTIMATE <br /> Because Public Health has requested changes in the scope of work, additional fees will be <br /> required. These fees include the tank closure permit, closure plan preparation, and the <br /> additional cost for an angle boring versus a vertical boring. <br /> Kleinfelder's Aril 23, 1992 proposalgnoted an estimated fee of $7,300 on a time and <br /> materials basis m accordance with our 1991 Fee Schedule for Environmental Services. A <br /> breakdown of the additional fees for the revisions to Task 2 and the Underground Storage <br /> Tank Closure Permit is presented below: <br /> Task 2- (2 vertical and 1 angle boring)Additional Changes <br /> Professional Services $ 200 <br /> Drilling Services/Materials $ 300 <br /> Tank Closure Permit <br /> Professional Services $ 250 <br /> Tank Closure Permit Fee $ 190 <br /> Project Addendum Cost $ 940 <br /> Original Estimated Project Cost $ 7,300 <br /> TOTAL REVISED PROJECT COST $ 8,240 <br /> If this work plan addendum is acceptable to the San Joaquin County Purchasing Division, <br /> Kleinfelder will need an authorization for an additional $940.00. <br /> I8-92-330 <br /> Copyright 1992 Kleinfelder,Inc. <br />