My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
333
>
2300 - Underground Storage Tank Program
>
PR0516800
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 1:33:00 PM
Creation date
11/5/2018 1:35:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0516800
PE
2381
FACILITY_ID
FA0012813
FACILITY_NAME
CITY OF STOCKTON
STREET_NUMBER
333
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
333 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUNTER\333\PR0516800\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATb/ <br /> Project Location The right of way adjacent to 333 N. Hunter St , Stockton CA 95202 <br /> Owner The City of Stockton <br /> Phone No.(2O9) 937-8320 <br /> Contractor Jim Thorpe Oil, Inc. PhoneNo�209)368-6175 License No.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> — A. Pea gravel–smooth, rounded material not more than one-half(112) inch in diameter <br /> _ B. Crushed rock–selfcompacring material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be trade between <br /> the backfillmaterial-and.tanks/pipes made of poly resin glass or similar marerialr.)---- <br /> X C. The tanks and excavation were filled with concrete slurry. <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 g�aal1l�on tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil, Inc. by <br /> ■ Richard Thorpe, Pres. <br /> Name t <br /> * Conti or <br /> ignature <br /> " Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.