My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
540
>
2300 - Underground Storage Tank Program
>
PR0503521
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 2:32:00 PM
Creation date
11/5/2018 1:35:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0503521
PE
2381
FACILITY_ID
FA0005868
FACILITY_NAME
BRANNON TIRE (FORMERLY)*
STREET_NUMBER
540
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
540 N HUNTER ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HUNTER\540\PR0503521\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
12/5/2016 5:23:55 PM
QuestysRecordID
164866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..•... w,l/wl«,n, YIN. <br />�wW a. V...wwet, �ti• <br />Atrironafto Van aptonaen <br />am PMnaMal <br />Few Wge« <br />Oanlal L. flora <br />John 0. Most. M.O. <br />W"IWn J. wade <br />Mmy Anna Law <br />Facility Name <br />Address <br />CkraLodi <br />11 East Hazalton Avenue, P.O. Box 2000 _ `" JM �� <br />Stockton, Gami 201CRY <br />200148"78i City of tupoa <br />city of atocitton <br />Jogl Khanna. M.O.. M.F.H.. Otattiat itya <br />Health Oflow C <br />JJoaquin Ce <br />aey <br />can JoatrvN C <br />Date of Inspection 5- (a — Q9-4 Inspector <br />MONITORING ALTERNATIVE /5 �(—cue-S —+ I <br />:tAnnual precision test on tank(s) and piping. <br />Dally inventory reconciliation with submission of quarterly statement regarding <br />compliance with allowable variation. <br />"Pipeline leak detectors on pressurized piping. �i�� o�ecm o� <br />V Daily operational check of suction piping function. ' 6 �I U <br />._j,GEalibrated meters for inputs and withdrawals: <br />Weights and Measures sticker <br />_ZCertification by qualified repairman <br />Implementation of this monitoring alternative requires that the following CIRCLED items <br />be completed by the specified dates. <br />T Precision test(s) must be performed by — and results submitted to <br />this office within 30 days of the test. <br />2� Pipeline leak detectors must be installed on pressurized piping by <br />C3 Daily inventory reconciliation must be started immediately, with records maintained <br />at the facility for review. <br />4 Document daily check of suction piping function starting immediately. <br />Submit quarterly statement to this office that allowable variation on inventory <br />reconciliation has not been exceeded or a list of dates ano varia ions tat <br />exceeded allowable.* The first statementisis d� <br />Dispenser meter(s) must be calibrated by with copy of/ <br />certification or Weights and Measures sticker number submitted to this office. <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />• If allowable daily inventory variation is exceeded, refer to Section 2644(f) for <br />requ irCd actions. <br />3-8(, r,T I <br />
The URL can be used to link to this page
Your browser does not support the video tag.