Laserfiche WebLink
10 <br />101 <br />T, 1 1 1 i <br />\777�777 <br />4�33 <br />E Vf- <br />5 5 ON11 <br />'M <br />0 <br />ti <br />< <br />W A i <br />5< , , , <br />L"z J <br />J <br />E <br />E�X <br />C2 <br />7- <br />j 1 <br />LLJ 1�1 <br />jj <br />A <br />Vd <br />J <br />.. ...... .. <br />W <br />Z <br />- --- - ------ <br />CL <br />0 <br />yy <br />r. -fes I <br />:D <br />f <br />0) <br />....... ... - ------- ------- ........... <br />CL <br />T <br />6 <br />-Ex, VENT RISERS (2), ATTACHED TO TWO 0I. <br />f POST SIGN. INSTALL VEDEER­ROOT <br />CARBON CANISTER. REFER TO DETAILS <br />THIS SHEET. REQUIRES EVR VENTLINE <br />STEEL ENCLOSURE <br />UNDERGROUINP <br />< C"ANOPY I <br />CANOPY 2 <br />CL <br />< <br />Q 1-1 �NK <br />VY <br />Z <br />AREA <br />L <br />---------- --- -- APPROX. PROPERTY UNE <br />----_--- - - <br />----- ------------- <br />----- - --- --- <br />5' FL, <br />. ...... ... . <br />------ - ----- <br />PLACE WIRE IN SHALLOW CUT' IN <br />Ex, TANK SLAB, WIRE TO BE <br />ROUTED IN Ex, CONDUIT FROM <br />IFANK TO BUILDING, A R K 5 T <br />M LIST: <br />'I VR861290--002 2* CARBON CANISTER VENT PIPE INSTALLATION KIT <br />1 VR331500-358 TLS -350 PLUS, TLS 3508 W/ ECFU2 <br />GRAPHIC SC' Al -1] 1 VR331500-358—C UPGRADE SOFTWARE <br />1 VR332250-001 VACUUM SENSOR MODULE, SEVEN INPUT <br />o 5 10 20 40 1 VR330030-515 IN—STATION DIAGNOSTICS MANUAL & V&POR PRESSURE SENSOR <br />12 VST VST—EVR—NBCC EVIR BALANCE NOZZLE <br />12 VST VST EVR--SBK EVR BALANCE SAFETY BREAKAWAY <br />12 VST VSTA—EVR--012 12" EVIR BALANCE VAPOR RECOVERY HOSE <br />IN 1;1E1, 12 VST VDV--EVR--096 8' EVIR BALANCED VAPOR RECOVERY HOSE <br />1 hich — 10 f 1- 1 HU5885 2" P/V VENT -THREADED W/ 3"WCP & 6"WCP 1Wl INTERNAL SCREEN <br />MQUIEMERCM- <br />2007 CA Building Code, 2007 CA <br />Electrical Code, 2007 California <br />Fire Code, NFPA 30, 30A, and <br />704, CA Underground Storage <br />Tank Regulations, Bay Area Air <br />Quality Management District. <br />am <br />MAIM, <br />SAf IGN <br />NOT 1-0 SCALE <br />SCOPE OF WORK: <br />1> Install new Veeder Root CarbonCanister Vapor Polisher (CCVP) onto existing <br />vent pipe. <br />2. Hanging hardware will be replaced with 12 VST---EVR--NB nozzles and VST <br />hoses on 6 dispensers. <br />3. Connect to existing stations Veeder-Root 11-S--350 console. <br />4. A Veeder-Root 329356-004 Smart Sensor In module and a <br />Veeder-Root 332250--001 atmospheric sensor shall be installed in the TLS console <br />5. A Veeder--Root 331946-001 Pressure sensor will be installed in the dispenser <br />closest to the underground -tanks. <br />6. Vapor return and vent piping shall be a minimum of 2" in diameter and be <br />equipped with an underground and/or vent manifold connecting the heads <br />paces of <br />all gasoline storage tanks. <br />7. The vapor return piping shall not include any liquid condensate traps. <br />8. Vent piping will be supported by an external structure adequate to support <br />the CC'VP. <br />9. The outlet of the CGVP shall be 12' minimum above ground. <br />NOTES: <br />1 All necessary permits shall be obtained from the City of <br />Stockton for the installation of the Veeder—Root Carbon <br />Canister Vapor Polisher (CCVP). <br />2The contractor and installers must possess the appropriate <br />State Contractor's licenses, as well as a Veeder—Root Level I <br />Certificate, and an ICC EVIR Phase 11 Certificate. Contractors <br />and Installers shall keep a copy of the licenses and <br />certificates onsite during construction, and may be field <br />verified, <br />3. Contractor shall contact Underground Service Alert at least <br />48 --hours in advance of any underground excavation, <br />Contractor shall be aware and responsible for all <br />underground piping and conduits, whether shown on the plan <br />or not. Engineer is not responsible for showing existing <br />underground facilities. <br />4The CCVP, must be monitored by a Gilbarco EMC, <br />Veeder--Root TLS -350, a TLS -350 plus or a TI-S-35OR <br />console, with Version 29 software or higher, <br />5. A cold start of the Veeder­Root TLS -350 monitor is <br />required following installation, with the Fire Inspector present. <br />6. Retrieve the Simplicity data prior to system shutdown. <br />7Install a minimum 3/4condult with Beldon low voltage wire <br />from the V—R TLS -350 to the CCVP`, located at the vent <br />riser, except where the manufacturer's approved direct burial <br />wire and sealant are used through paved areas, if shown on <br />the Site Plan. <br />8. The CCVP shall not be mounted directly to a non—supported <br />vent riser, The support of the CCVP shall be as shown on <br />the plan. <br />9The CCVP shall be attached to the vent riser using the <br />mountin( ' 3 hardware supplied by the manufacturer. <br />10. A flexibl's connection may be required at the inlet pipir,,4 <br />connection to the vent riser. <br />PA/ assernbly <br />(customer suppliec) <br />Carister outlet rl 1* yon P- <br />'IlUst be 12 feot " or'T' Scfied, 40 U[)pW Wilt P I),, <br />nirrimurn above arade (from kit or cusl supplied) <br />Canister support <br />brackol, & fastenci <br />SCALE: <br />-- — -------- . ........... <br />(frorn kit) <br />National, 'S'illale and Local <br />Canister support,,_--�, <br />DESIGNED: MBR <br />;,-budswhit,ts 'A <br />(3 each side) <br />DRAWN: is <br />C�iitt.:r iiie of L;fuckeM3 <br />ra i <br />- - - __ -- -_ _-- <br />C1- -1 E 'KED: MBR <br />PR 0J, E N G R.: MBR <br />Uj <br />P(;0 J.M G , R, MBR <br />dirliensio'] <br />I oral codes <br />(customer suppked) <br />Y: <br />2" (--)r 3" lower vent p per <br />INSTALL NEW B&B STEEL <br />rt <br />Scned. 40 (threi�dec to fit tee <br />If install rg 332954-002 or, <br />U <br />ENCLOSURE OVER NEW <br />332954-003), customer supplied) <br />I -ower J -box - Install per all <br />t <br />IL <br />Naitional, Stateamd Local <br />at <br />codes (custotner supplied), <br />DIESEL RISER, <br />Epoxy enclosed cons emica s <br />In urcition box. <br />CONTRAQCTOR TO VERIFY <br />0 <br />DIRECT WIRED <br />INSTALLATION <br />NOT- TO SCALE <br />yr <br />CANISTER CONNECTION, AS <br />STt1c,,kton <br />�L <br />0M <br />1 <br />- - --------- <br />LLJ <br />is <br />r. <br />< <br />L <br />Z <br />E S S /0 V4Z <br />5. RO <br />ti <br />vs ?ray <br />0 <br />No. Ek)(,40 Z <br />JK Exp 3/31/0 <br />CIVIL <br />VICINITY MAP <br />C.) <br />EX. POSTS <br />2009�_ <br />-21 <br />NOT 1-0 SCALE <br />Z <br />cy� <br />Z <br />ko <br />LU <br />> �E <br />< <br />ca <br />PA/ assernbly <br />(customer suppliec) <br />Carister outlet rl 1* yon P- <br />'IlUst be 12 feot " or'T' Scfied, 40 U[)pW Wilt P I),, <br />nirrimurn above arade (from kit or cusl supplied) <br />Canister support <br />brackol, & fastenci <br />(frorn kit) <br />National, 'S'illale and Local <br />Canister support,,_--�, <br />;,-budswhit,ts 'A <br />(3 each side) <br />Epoxy enclosed corinections <br />C�iitt.:r iiie of L;fuckeM3 <br />ra i <br />0 �vest Tbolt <br />15,7" <br />Uj <br />Min <br />dirliensio'] <br />I oral codes <br />(customer suppked) <br />II >eI <br />2" (--)r 3" lower vent p per <br />INSTALL NEW B&B STEEL <br />rt <br />Scned. 40 (threi�dec to fit tee <br />If install rg 332954-002 or, <br />U <br />ENCLOSURE OVER NEW <br />332954-003), customer supplied) <br />I -ower J -box - Install per all <br />t <br />Naitional, Stateamd Local <br />at <br />codes (custotner supplied), <br />DIESEL RISER, <br />Epoxy enclosed cons emica s <br />In urcition box. <br />CONTRAQCTOR TO VERIFY <br />Grade <br />DIRECT WIRED <br />INSTALLATION <br />NOT- TO SCALE <br />yr <br />CANISTER CONNECTION, AS <br />NECESSARY. <br />ECESSAIRYLLJ <br />�L <br />0M <br />1 <br />- - --------- <br />LLJ <br />is <br />< <br />0 <br />EX. SIGN- <br />� <br />C.) <br />EX. POSTS <br />Z <br />Z <br />PA/ assernbly <br />(customer suppliec) <br />Carister outlet rl 1* yon P- <br />'IlUst be 12 feot " or'T' Scfied, 40 U[)pW Wilt P I),, <br />nirrimurn above arade (from kit or cusl supplied) <br />Canister support <br />brackol, & fastenci <br />(frorn kit) <br />National, 'S'illale and Local <br />Canister support,,_--�, <br />;,-budswhit,ts 'A <br />(3 each side) <br />Epoxy enclosed corinections <br />C�iitt.:r iiie of L;fuckeM3 <br />ra i <br />0 �vest Tbolt <br />15,7" <br />Uj <br />Min <br />dirliensio'] <br />I oral codes <br />2" or 3" Recucing tee,Sched. 1(.,) <br />(from kit or, cusl supplied <br />fittings), All pipe and pipe fittings <br />must bo schecule 40. All tube <br />fittings r-riust be UL listed and <br />installed per all applic.adfa nationa <br />,,tato ard local Godes and approved <br />I)y the lo�al ejjtl�'or ty having <br />jurisdiction, <br />-pin conno-tor of stele (friars <br />kit) attaches to C XINP valve <br />Cord grip ,ffroni kit) <br />00 0 <br />N <br />uppe r.J-bo,x -- Install por all <br />National, 'S'illale and Local <br />codas (cukorner supplied). <br />Epoxy enclosed corinections <br />Minimum <br />ra i <br />in Urct',on box, <br />Install conduit per all <br />Uj <br />National, State and <br />dirliensio'] <br />I oral codes <br />(customer suppked) <br />2" (--)r 3" lower vent p per <br />INSTALL NEW B&B STEEL <br />Scned. 40 (threi�dec to fit tee <br />If install rg 332954-002 or, <br />U <br />ENCLOSURE OVER NEW <br />332954-003), customer supplied) <br />I -ower J -box - Install per all <br />Naitional, Stateamd Local <br />codes (custotner supplied), <br />DIESEL RISER, <br />Epoxy enclosed cons emica s <br />In urcition box. <br />CONTRAQCTOR TO VERIFY <br />Grade <br />DIRECT WIRED <br />INSTALLATION <br />NOT- TO SCALE <br />00 0 <br />N <br />0 9 0,34 \ (I w i)90,.34R(jse,(Jwg THIS IS AN SINAL, UNPUBLISHED WORK AND MAY NOT BE DUPLICATED, PUBLISHED, OR OTHERWISE USED WITHOUT WRITTEf )NSENT OF ROBERTSON ENGINEERING,, IN <br />Uj <br />_j <br />< <br />INSTALL NEW B&B STEEL <br />U <br />ENCLOSURE OVER NEW <br />CARBON CANISTER <br />DIESEL RISER, <br />CONTRAQCTOR TO VERIFY <br />DIESEL RISER AND ADJUST <br />CANISTER CONNECTION, AS <br />NECESSARY. <br />ECESSAIRYLLJ <br />�L <br />0M <br />1 <br />- - --------- <br />LLJ <br />< <br />0 <br />EX. SIGN- <br />� <br />C.) <br />EX. POSTS <br />Z <br />Z <br />LU <br />> �E <br />< <br />LOLJ <br />0 <br />- <br />- - ------ <br />-- - <br />Z <br />< (N <br />fa- qj- <br />Z <br />< <br />(/) <br />Ex. Vent Risers <br />L -,j ('0 <br />Z <br />< <br />C) <br />Z <br />Y <br />0 <br />U) <br />SIGN MOUNT <br />NOT TO SCAL-E <br />(1-00KING [AST)FSHEET <br />0 9 0,34 \ (I w i)90,.34R(jse,(Jwg THIS IS AN SINAL, UNPUBLISHED WORK AND MAY NOT BE DUPLICATED, PUBLISHED, OR OTHERWISE USED WITHOUT WRITTEf )NSENT OF ROBERTSON ENGINEERING,, IN <br />