Laserfiche WebLink
The excavation was backfilled with a portion of the clean native soil, pea gravel and base rock. The <br /> pea gravel material was placed in one foot lifts and spread level. The native soil and Class II base <br /> rock was also placed in one foot lifts and compacted with a vibratory sheeps foot. The entire surface <br /> area was then capped with 4" of asphalt. <br /> Please feel free to contact me if you have any questions regarding this project. <br /> Sincerely, <br /> k <br /> Donald E. Light <br /> Engineering Contractor#657366/Haz. Waste Endorsed <br /> C.C. Byron Arndt <br /> Michael Estrade <br />