Laserfiche WebLink
Page of <br /> G- <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Wayne Perry Inc. See Attached Results Equipment Resolution:.0007 <br /> Spill/Overfill Containment Box Number <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RI): 2 '� <br /> Test End Time: �2'.�{ <br /> Final Reading(RF): 2• S_ <br /> Test Duration: Cj L,j <br /> Change in Reading(RF-RD: O-RMLA C> Wbn <br /> Pass/Fail Threshold or -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Criteria: <br /> ,O'Pass ❑ El❑ Pass 'Pass Pass Pass Pass El <br /> Test Result: ass <br /> Fail ❑ Fail El El ❑ Fail `❑ Fail ❑ Fail ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ARCO/BP—#04932 <br /> 16 E Harding Way <br /> Stockton, CA. 95204 <br /> N04981R- SB 989 Repairs — <br />