Laserfiche WebLink
Jun 05 07 09:18a Elite Iv Contractors Inc 2094616342 P.1 <br />f� ... _ ............. _ .... � .. ,. � ...., . _ ....... _ 'TANKS <br />i <br />= <br />UNDERGROUND STORAGE TANKS -INSTALLATION- <br />CERTIFICATE OF COMPLIANCE <br />(j lane vase Pe* tank) i <br />1L INSTALLATION <br />/ [Check ail mer appoy% <br />it The instaier has been trained and certified by the tank and Aping manufachuers. <br />-8- The ins on has beesr ir4wcted and certified by a registered professions! engineer having education and <br />experience with underground storage tank itstalations_ <br />fl The its ort has been iiq>eded and appmved by the unified Program Agency- <br />41' - <br />gen y_11'- Al work fisted on the manutactuer's instaEatbn cheddsst has been complet <br />'tS The m2aler has been certified or 5crt s by the Corthact m State License Boam <br />• 12,-'/ The underground storage tank, any pnmary piping, and secondary containment was irk according to <br />appy vokuitary, consensus studs and w TWen mks irrsZagaWn procedures- Description of <br />work ting certified. <br />�. TANK OWt1tERlAGEM SIGNANRE <br />Fe gym3ttfri9—Ud b—mumad acral.b mrbetd nor %—AmdQe- <br />S)GAARRE OF TAW OVOIERWIGE i <br />L FACR- TY IDENTiMATtON <br />BUs"s mAmE ism a F R For D8w <br />MA.) <br />ILe m <br />FACJttN 1o. <br />, <br />T <br />1L INSTALLATION <br />/ [Check ail mer appoy% <br />it The instaier has been trained and certified by the tank and Aping manufachuers. <br />-8- The ins on has beesr ir4wcted and certified by a registered professions! engineer having education and <br />experience with underground storage tank itstalations_ <br />fl The its ort has been iiq>eded and appmved by the unified Program Agency- <br />41' - <br />gen y_11'- Al work fisted on the manutactuer's instaEatbn cheddsst has been complet <br />'tS The m2aler has been certified or 5crt s by the Corthact m State License Boam <br />• 12,-'/ The underground storage tank, any pnmary piping, and secondary containment was irk according to <br />appy vokuitary, consensus studs and w TWen mks irrsZagaWn procedures- Description of <br />work ting certified. <br />�. TANK OWt1tERlAGEM SIGNANRE <br />Fe gym3ttfri9—Ud b—mumad acral.b mrbetd nor %—AmdQe- <br />S)GAARRE OF TAW OVOIERWIGE i <br />nATE <br />fivk,v (,J/, <br />DJZ <br />