My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2002 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:53:11 PM
Creation date
11/5/2018 1:42:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2007
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer N Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure N Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution 0 to 15" Hg Vacuum <br /> NORM <br /> Tank# 7 Tank# Tank# r' Tank# <br /> Is Tank Exempt From Testing?' ❑ Yes El No El Yes El No ❑ Yes El No [I Yes El No <br /> Tank Capacity: Zbt7dALLONS ALLONS J(GALLONS GALLONS <br /> Tank Material: — 67 <br /> Tank Manufacturer: ' <br /> Product Stored: _ <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: _ <br /> Test Start Time: <br /> Initial Reading(R�: j d"HG 16"HG f p" HG "HG <br /> Test End Time: 7i <br /> Final Reading(RF): ,6 HG )n " HG )C,T HG "HG <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): "HG �" HG " HG "HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero Zero <br /> Pass Q Fail *Pass <br /> El. ❑ 'Wass <br /> Was sensor removed for testing? y ❑Yes P%No O NA ❑Yes A&% ❑NA ❑Yes Wo ❑NA ❑Yes ❑No 0 NA <br /> Was sensor properly replaced and ApYes ❑No 'O NA 10 Yes ❑No ❑NA Wes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ARCO/BP - 04932 <br /> 16 E HARDING WAY <br /> STOCKTON, CA 95204 <br /> NO SB989 TESTING <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.