Laserfiche WebLink
Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: p Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> p Other(Specify) <br /> Test Method Used: p Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> oTestuipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# Sump# � Sump# SumpDiameter: _ <br /> Sump Depth: <br /> Sump Material: — <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: 1 <br /> Portion of Sum Tested T'ABOVE HIGHEST T'ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ® N=\ <br /> product and water)?" <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe [IYes [INo ®NA ❑Yes ❑No ®NA El ❑No ®NA p Yes [INo ®NA <br /> shutdown?. <br /> Was fail-safe verified to be ❑Yes El No M NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA O Yes ❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: <br /> Initial Reading(Ri):, 2,2165 156-52 ' <br /> Test End Time: "Z.S' Z'5 -Z,57 <br /> Final Reading(RF): ' 2-17,1141 .375 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Ri): _21 <br /> +J;cxop <br /> Pass/Fail Threshold or Criteria: -0.0020 40020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> 'fest Result: � Pass E]Fail P�s�� � El`Pass D MAI <br /> Was sensor removed for testing? 4 Yes ❑No ❑NA 14Yes ❑No ❑NA E@ Yes ❑No ❑NA} ❑Yes p No El NA <br /> Was sensor properly replaced and �0Yes [INo p NA JjYes [INo p NA .B Yes [INo [INA p Y=NoE[1) <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> ARCO/BP — 04932 <br /> 16 E HARDING WAY _ — <br /> STOCKTON, CA 95204 <br /> NO SB989 TESTING — <br />