My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2002 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:53:11 PM
Creation date
11/5/2018 1:42:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2007
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/30/2007 12:22 2094669F18 VALLY ARCO PAGE 65/06 <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN — PAGE 2 <br />VI. DISPENSER MONITORING <br />MCINPeRING OF AREAS BENEATH DISPENSERS) IS PERFORMED USiNG THE FOLLOWING METHOD(S) (Check all that apply) M$), <br />1. CONTINUOUS ELECTRONIC MONTTO N� IUNDER_ DISPENSE CONTAiNMENT (UDC) <br />% <br />PANEL MANUFACTUitt:R: rssl' MOUP-L p: -/ O- Mix <br />LEAK SENSOR MANUFACTURER; M"' MODEL M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? (bra, YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? Cita. YES ❑ b. NO <br />WiLL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SFIUTDOWN? I4, YES Q b. NO Ms7• <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: Mss. MODELiI(S): Mss• <br />❑ 3.VISUAL MONTTORING DONE: ❑ a. DAILY ❑ b. WEEKLY meomaivey perm -"I) MfA. <br />❑ 4. NO T)ISPFNSF.RS <br />❑ 99. OTHER (Specify) Mrl. <br />VII, ENHANCED LEAK DETECTION <br />_ <br />[a I. WE NAVE BEEN NOTIFIED BY THF STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />DETECTION (ELD) FOR TI4E UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TItAIlV NQ <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check 211 that apply) Man <br />I EKTHIS UNDERGROUND <br />. STORAGE TANK MONITORING PLAN (Required) <br />2. [OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3, 2'I'HE YACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/200 <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE. TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. TW'STATF. WATER RV-fkntJR.C£5 CONTROL BOARD (SWRCS) PUBLICATION; "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCS PUBLICATION; "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify); MPI. <br />Personnel with LIST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will haven "Designated UST Operator" who has passed the operator exam administered by the international Code Council (ICC). By <br />January I, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training kvill include, but is not limited to, the following; <br />> Operation of the UST systems in a manner consistent with the facility's best management practice". <br />> The facility employee's role with regard to the Irak detection equipment. <br />> The facility employee's role with regard to spills and overfills. <br />Whom to contact tar cmergenceS and leak detection alarms. <br />For facility employees hired on or after January?, 2005, the initial trdining will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDIMONAL INFORMATION <br />Phase use this station to incl de any additional UST System monitoring-relatod information (e,S„ additional information required by your local agency): MAS. <br />�vt�tn�+ofn / sy <br />A 4 e �T <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" iDENTiFIED iN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACtf,TTY FORM WILL HAVE UL t IMA I r, AU I H(JKI'I Y f'Wt PERt•'VKM1NU'I'HE MONITORING ACTiViTIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WiLL PERFORM AND DOCUMENT MiNIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR j 2715 b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTTATiON: I ccrtft that the information provided herein iq true and accurate to the best of my knowledge, <br />OWNE /0 PRATO SIGNATURE REPRESENTING <br />DATE: Msl. <br />110,xiwl M•JII, <br />ElApOperatoC <br />^ <br />`/,/ <br />OWNER/OPERAT NAME ( int): "tn OWNEWOPERATOR TiTLE: W.I. <br />(Agency Use On1,v) This plan has been reviewed and: I Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: Date; <br />Comments/Special Candid <br />,SJC.P:Hij6d (1171113) -3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.