Laserfiche WebLink
Page,_-_'kof <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) VESTING <br /> Test Method Developed By: UDC Manufacturer D Industry Standard ® Professional Engineer ❑ <br /> Other(Specify) <br /> Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br /> Under-Dispenser Containment Number Below <br /> UDC Manufacturer: <br /> UDC Material: ,rg'iE'6�As"S i zi? �ysS >dr`,�GE 4 rY- <br /> UDC Depth: i" 7/ / <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: Its <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 3 3 3 <br /> Condition of UDC prior to <br /> testin :` e'Lt9ti NtZAti � 4 e'G£A� [•t ' 4) c'lc,t.v <br /> Portion of UDC Tested' 2"Above Highest 2" bove Highest 2"Above Highest 2"Above Highest <br /> Penetration Penetration Penetration Penetration <br /> Does turbine shut down when ❑Yes❑ No NAM ❑Yes D No NAM ❑Yes❑ No NA® ❑Yes❑ No NA® <br /> UDC sensor detects liquid. <br /> Turbine shutdown response time ❑Yes D No NA® D Yes❑ No NA® ❑Yes❑ No NA® ❑Yes❑ No NA® <br /> Is system programmed for fail- [IYes[INo NA® ❑Yes❑ No NA® [IYes[INo NAM ElYes[INo NAM <br /> safe shutdown?' <br /> Was fail-safe verified to be ❑Yes D No NA.® D Yes❑ No NAM ❑Yes❑ No NA® ❑Yes❑ No NAM <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test <br /> Test Start Time: //.ZS :? /,7: 2f. jo.,X31 iz:33 <br /> Initial:Reading(RD: /S q Y e..2 73 7 '/d. zLi92 /z YO r'& <br /> Test End Time: /: p 11 ,� z <br /> Final Reading(RF): 7 Y,d Y711 . 4. 2 eel/z> Yz S 7 6 r <br /> Test Duration: 15 Min 15 Min 15 in 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Rj): - aov Z - ava 2 0 2 _PCV 217- ,vat 30 C?vv Z <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Test Result` Pass Pass ❑ Piss j 'Pass Pass Pass El Pass Pass <br /> � <br /> 11 FAVI, ElFail ❑. Fail.-; L7 Fail D hail El-X ❑ hail <br /> Was sensor removed for testing'? Yes❑ No NAE] D Yes❑ No NAE] Yes❑ No NAD ❑Yes❑ No NAE] <br /> Was sensor properly replaced and ®Yes❑ No NAD ❑Yes❑ No NAD Yes❑ No NAD D Yes❑ No NAD <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up forfailM tests) <br /> ICO/BP - 04932 _ <br /> E HARDING WAY <br /> OCKTON, CA 95204 <br /> SB989 TESTING <br />