Laserfiche WebLink
714 <br /> Tait Environmental Systems <br /> LIST Construction • Design • Maintenance Compliance <br /> c zitr�4 Z- <br /> SPILLJON'ERFILL CONTAITMENT BOXES <br /> Test Method Developed By: [N Spill Bucket Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> ❑Pressure ❑ Vacuum �`]Hydrostatic <br /> Test Method Uses: \ <br /> ❑ Other(Specify) <br /> Measuring Equipment Used for Testing: lklktf <br /> Spill Boz# Spill Boz# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pre ssure/vacuum/water and 5M ( ,iJw�e— 5 <br /> starting test: <br /> Test Start Time: S <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): �— <br /> pass/Fail Threshold: <br /> test Result: anny S <br /> Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br /> ermit was obtained for the repairs) <br /> CA Lic 9588098 • AZ Lic #095984 • NV Lic #0049666 <br /> 1863 North pri�Iee•SRancho COoadovaCCallfifornaa995742 .•7916585881090.•7916.856-1011Fax <br /> Fax <br /> 3283 Luyung rwvwr.tait.com <br />