My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
COMPLIANCE INFO 2002 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:53:11 PM
Creation date
11/5/2018 1:42:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2007
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'L <br />'ARCO Products Company <br />Station #i3Z <br />Address E <br />i\'lechanical Leak Detector Test Data Sheet <br />Date 2Z ?0 OZ <br />Test Information <br />Replaced All Failed Leak Detectors Yes No N/A_ <br />If No, Replacement To Be Completed By (Date) <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures <br />knowledge true and correct. The mechanical leak detector _ <br />trip rate of 3 -ph at 10 PSI. <br />Inspected By: Contractor <br />AP; -3325 (12'00) <br />1 <br />2 <br />3 <br />=1 <br />5 <br />Product <br />NO1 <br />Z <br />Manufacturer <br />Model <br />Full Operating Pressure (psi) <br />Line Bleed Back (ml) <br />Trip Time (sec) <br />I <br />Metering Pressure (psi) <br />F/E Holding Pressure (psi) <br />' <br />Test Leak Rate (ml/min) (-ph) <br />PASS or FAIL <br />Replaced All Failed Leak Detectors Yes No N/A_ <br />If No, Replacement To Be Completed By (Date) <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures <br />knowledge true and correct. The mechanical leak detector _ <br />trip rate of 3 -ph at 10 PSI. <br />Inspected By: Contractor <br />AP; -3325 (12'00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.