Laserfiche WebLink
.I <br />EXISTING VENT <br />RISERS ( <br />DUST. CANOPY <br />EXIST. DISPENSE - <br />ON ISLAND (TTP•) <br />EXIST. F.I.C. UNIT - <br />EXIST. CANOPY C I <br />(TTP. OF 3) <br />EXIST. <br />CONC. <br />APPROACH 71L <br />P.L. <br />EXIST. PLANTER <br />INTERSDTWL MONITOR <br />(tea <br />EXISTING TANK SLAB <br />v <br />EXISTING FILL SUMP CTYP.) <br />1 2 3 4 <br />5 6 8 12 <br />67 WNL. <br />EXISTING BUILDING <br />EXISTING <br />VEEDr;R-ROOT <br />505MONnDRING <br />SYSTEM <br />1 <br />I <br />� I <br />I 1 <br />I I <br />I I <br />I I <br />I l <br />I <br />N II +I+ <br />L <br />EXIST. PLANTER <br />p.L 151: <br />EXIST. <br />CONC. <br />SIDEWALK <br />INSTALLATION NOTES: <br />BEFORE START OF SAW CUTTING, REMEASURE TO CONFIRM THAT EXISTING MANHOLE FRAME ,iSJi4I COMPATIBLE <br />wn NEW MANHOLE LID. IF LID IS CDMPATIBLE, DO NOT CUT UNTIL FIELD ENGINEER HAS CONFIRMED A NEED TO <br />REPLACE MANHOLE FRAME. <br />Q1 COKTRACTOR TO SAW CUT 6' X 6' MINIMUM SECTIONS OF EXISTING TANK SIAM AT EACH MANWAY AS SHOWN. <br />(T)CONTRACTOR TO REMOVE EXISTING FILL SPILL BUCKETS. REMOVE EXISTING DROP TUBE FLIPPER VALVE (IF ANY), <br />AND ANY NON -TVR BALL FLOATS. <br />QOONTRACTOR TO INSTALL NEW ENR RISER ADAPTERS. <br />(aDCONTRACTOR TO INSTAL NEW 5 GALLON SPILL CONTAINMENT BUCKETS AND MANHOLE W/ FRAME AT EACH TANK <br />FILL ENE VR -102-8 COMPLIANT. <br />5ZD COWRACTOR TO (WALL NEN FILL DROP TUBE AND BALL FLOATS AT EACH TANK. ENR VR -102 -B COMPLIANT. <br />©CONTRACTOR TO INSTALL NEW RISER COMPONENTS AT EXLSTINC TANK GAUGE RISERS, FIELD VERIFY EXACT RISER <br />LOCATKIN, ENR VR -102-B COMPLIANT. <br />Q CONTRACTOR TO INSTAL NEW PRESSURE VACUUM VENT VALVE AS NEEDED, AT EACH GASOLINE VENT RISER. <br />TNR VR -102-B COMPLIANT. <br />Q CONTRACTOR TO PATCH AL REMOVED CCNGREFE TO MATCH EXISTING. <br />NOT USED. <br />10 INSTAL NEW VEEDER-ROOT OVERFILL ALARM W/ ACKNOWLEDGMENT SWITCH ANO NEW AUTOMATIC TANK <br />GAUGING IF NOT EXISTING. <br />INSTALL <br />n OVERFILL <br />ALARM, I <br />10 <br />I <br />EXIST. CANOPY F <br />COLUMNS (TYP) I <br />a � <br />DISPENSERS ON <br />ISLAND (TYP.) <br />EXIST. P.S.C. UNIT <br />EXIST. ES.O. <br />—ExisT. DRIVE SLAB <br />HARDING WAY <br />91 SUPER <br />c} <br />89 (SS-P^E�C}IAL <br />�.../ <br />° <br />EXISTING <br />TURBINE <br />SUMP (ITP.) <br />I <br />EXISTING <br />U.G. <br />STORAGE <br />TANKS. <br />EQUIPMENT LIST <br />e <br />65218 -TVR- 164042RTOS2 <br />6521G -EAR- 1643M42RrC54 <br />FILL DETAIL (GASOLINE) <br />DGGUIENT NIG 7K NipPll�igN NRiW REIRNIa TTI FAW FFl1IER <br />M0 <br />TK RRNAre 15f OF AIITEIaR= PETS RL Na PNET NfREaF SlIlL W <br />E%1REG, GlPl1CAlFD. p57PolA/IFG, Glsu,osEo oR TIME AwwreLc � <br />NiGRaE.o�W E�Iaf1Y F� FIE �No /�tlaAEs Nn Irs aiaNTr <br />S GOOlMF1(f, NOn6VEA <br />Nn I+fR3G11, f11✓•1 OR L011'ORITIGN THIS <br />N13EGF GE GET Ya NAVi MREM 19 ANL <br />MANUFACTURER <br />MODEL i <br /># DESCRIPTION <br />Fll�nam� <br />Foo[IHT Pro]�cl <br />04932 <br />NSC -2100 VAPOR <br />O 42" DIAMETER MULTI -PORT SPILL CONTAINMENT MANHOLE h FRAME <br />POMECO <br />52f <br />2 PHASE I BRONZE SWIVEL ADAPTER <br />OPW <br />TiV -EVR <br />3 PHASE I VAPOR TOP SEAL CAP <br />DPW <br />17!47 -TVR <br />OPHASE 1 VAPOR RECOVERY SPILL CONTANMENT. 5 GALLON <br />4 W/DRAIN VALVE PLUG <br />DPW <br />1SC-2100 <br />CAST IRON, <br />5 FACE SEAL ADAPTER. PHASE I RISER, ATG RISER. FILL RISER <br />DPW <br />FSA -400 <br />a FILL BRONZE SWIVEL ADAPTER <br />OPW <br />61 SALP-EVR <br />7 FILL TOP SEAL GAP <br />a OPW <br />83477 -TVR <br />LL SPILL CONTAINMENT, 5 GALLON CAST IRON, <br />OPW <br />TSC-2IOO <br />8 <br />/TVR DRAIN VALVE <br />a <br />9 ACK SCREW ASSEMBLY IN FILL BUCKET <br />OPw <br />61JSK-4400-TVR <br />D STRAIGHT FILL DROP TUBE <br />OPW <br />611 <br />11 FITTING. EXTRACTOR. TEE, 4"%4"X3"X3" <br />OPW <br />233 <br />ITANK GAUGE PORT COMPONENTS (GIP h RANG KIT) <br />MORRISON BROS. <br />305XPA110OAKEVR <br />- 13 THREADED PRESSURE VENT CAP <br />OPW <br />623V <br />14 NOT USED. <br />OPW <br />53VML-3120 <br />15 3" X 12" BALLFLOAT <br />Ir <br />1fi WATER SHIAD <br />DPW <br />17 RISER SUPPORT <br />OPW <br />18 ACKNONOW(ED(�I SWITCH.M WITH H& AUTOMATTIIC TANK GAUGE <br />V®ER-ROOT <br />w <br />LU <br />J 1, <br />F' <br />U) <br />LU <br />LU <br />U <br />EX15T. CANOPY 9 <br />1 <br />a <br />I <br />I z <br />EXIST. <br />CONC. <br />APPROACH <br />l� <br />G <br />GRAPHIC SCALE <br />42" MANI <br />O <br />FILL CAP <br />FILL 5 GALLON <br />DRAIN <br />BUCKET (YI/ <br />VALVE} <br />O <br />JACK SCREW - <br />ASSEMBLY <br />0 <br />FACE SEAL. <br />RISER <br />STRAIGHT - <br />DROP TUBE <br />to <br />PART / <br />e <br />65218 -TVR- 164042RTOS2 <br />6521G -EAR- 1643M42RrC54 <br />FILL DETAIL (GASOLINE) <br />DGGUIENT NIG 7K NipPll�igN NRiW REIRNIa TTI FAW FFl1IER <br />M0 <br />TK RRNAre 15f OF AIITEIaR= PETS RL Na PNET NfREaF SlIlL W <br />E%1REG, GlPl1CAlFD. p57PolA/IFG, Glsu,osEo oR TIME AwwreLc � <br />NiGRaE.o�W E�Iaf1Y F� FIE �No /�tlaAEs Nn Irs aiaNTr <br />S GOOlMF1(f, NOn6VEA <br />Nn I+fR3G11, f11✓•1 OR L011'ORITIGN THIS <br />N13EGF GE GET Ya NAVi MREM 19 ANL <br />61VSA-1020LIAR <br />N/• DAT <br />1711T-7065 <br />Fll�nam� <br />Foo[IHT Pro]�cl <br />04932 <br />NSC -2100 VAPOR <br />Q <br />FSA -400 <br />_J a Q > o <br />615AIP-1020-TVR <br />0 L(] <br />634TT-7085 <br />"(n <br />> O <br />TSC -2100 FILL w/ DRAIN <br />V o r <br />61JSK-4400-EAR <br />o cn 'O <br />617-7368 <br />-� Q <br />2MW-4433 <br />(D = y-- <br />N n <br />305XPAS100AKEVR <br />0_ <br />6234 <br />L <br />Q <br />� m U ca <br />53VML--3120 <br />ccf) <br />� Q <br />a <br />�d <br />U <br />I <br />RB -1600 <br />0 <br />VR -790091-101 ZL iM <br />�+ Q) N <br />VR-790095—DG1 SWITCH <br />cn (Z' <br />YR-847390—IOX TANK GAUGE <br />O <br />Q <br />m U <br />Ir <br />STAGE I VAPOR RECOVERY & <br />Underground Service Alert <br />Gall: TOLL FREE <br />1 —800 <br />(& 227--2600 <br />T' WORKING DAYS BEFORE YOU DIG <br />FUELING 10 <br />POSITIONS <br />NOZZLES 10 <br />comuRanl jo6i <br />06763 <br />FILL DETAIL (GASOLINE) <br />DGGUIENT NIG 7K NipPll�igN NRiW REIRNIa TTI FAW FFl1IER <br />M0 <br />TK RRNAre 15f OF AIITEIaR= PETS RL Na PNET NfREaF SlIlL W <br />E%1REG, GlPl1CAlFD. p57PolA/IFG, Glsu,osEo oR TIME AwwreLc � <br />NiGRaE.o�W E�Iaf1Y F� FIE �No /�tlaAEs Nn Irs aiaNTr <br />S GOOlMF1(f, NOn6VEA <br />Nn I+fR3G11, f11✓•1 OR L011'ORITIGN THIS <br />N13EGF GE GET Ya NAVi MREM 19 ANL <br />Z <br />N/• DAT <br />RE <br />REVISIONS BT PROJECT E <br />Fll�nam� <br />Foo[IHT Pro]�cl <br />04932 <br />PER /1 3 <br />BID <br />a <br />d <br />O <br />.h"I Rama <br />TK1-1 <br />AS-BVILT <br />1/2' RIGID CONDUIT <br />OVERFILL ALARM <br />W <br />a _.I <br />F— <br />jit ) <br />Q <br />w <br />w <br />( n I--'" <br />z W <br />0 <br />D <br />Z <br />-- U Q <br />M <br />� W <br />I Z <br />Q <br />3 PHASE I CAP <br />J <br />z U Z <br />2 PHASE I <br />ROTATABLE <br />I <br />ADAPTER <br />LA a, <br />Z <br />I <br />ACKNOWLEDGMENT SWITCH <br />(L <br />= 0 <br />4 PHASE <br />2 <br />OVERFILL ALARM <br />N.,s. <br />y <br />P N15 <br />> <br />BUCKET (NO <br />DRAIN VALVE) <br />_.}'..1f. . <br />.y :♦ <br />C <br />LO �- Cfi <br />12 ATG CAP AND <br />'}' : ` i, <br />.i : y.: <br />LAS r V)RING <br />KIT <br />5 FACE SEAL <br />K1�ir•• <br />ADAPTER <br />- <br />11 EXTRACTOR <br />a n <br />FITTINGx <br />o <br />(BEYOND) <br />4"x12" L BLACK <br />1 GALL FIDAT <br />VALVE LOCATED <br />STEEL RISER W/ <br />PIPE CAP <br />�Km <br />O n r <br />AT 95 77 <br />C <br />1;0 <br />U <br />KUm <br />0ET ALARM <br />EXTRACTOR <br />FITTING <br />— <br />'L <br />90% <br />to <br />11 <br />CC <br />aZ <br />BAIL FLOAT VALVE <br />LOCATED AT 95% <br />0 N<Z" <br />CAPACJTY <br />xx <br />W n p i< I <br />15 <br />LL NJ G.IIW <br />aim <br />PLATE <br />ki <br />I <br />LL <br />STAGE I VAPOR RECOVERY & <br />Underground Service Alert <br />Gall: TOLL FREE <br />1 —800 <br />(& 227--2600 <br />T' WORKING DAYS BEFORE YOU DIG <br />FUELING 10 <br />POSITIONS <br />NOZZLES 10 <br />comuRanl jo6i <br />06763 <br />FILL DETAIL (GASOLINE) <br />DGGUIENT NIG 7K NipPll�igN NRiW REIRNIa TTI FAW FFl1IER <br />M0 <br />TK RRNAre 15f OF AIITEIaR= PETS RL Na PNET NfREaF SlIlL W <br />E%1REG, GlPl1CAlFD. p57PolA/IFG, Glsu,osEo oR TIME AwwreLc � <br />NiGRaE.o�W E�Iaf1Y F� FIE �No /�tlaAEs Nn Irs aiaNTr <br />S GOOlMF1(f, NOn6VEA <br />Nn I+fR3G11, f11✓•1 OR L011'ORITIGN THIS <br />N13EGF GE GET Ya NAVi MREM 19 ANL <br />N0. - <br />N/• DAT <br />RE <br />REVISIONS BT PROJECT E <br />Fll�nam� <br />Foo[IHT Pro]�cl <br />04932 <br />PER /1 3 <br />BID <br />CONST <br />.h"I Rama <br />TK1-1 <br />AS-BVILT <br />3 <br />8P WEST <br />TYPICAL TURBINE ELEVATION Elr.s. <br />COAST PROBUCTS, LLC MASTER REVISIONS <br />comuRanl jo6i <br />06763 <br />mawNr m1wea datM <br />4xs]%h <br />06/18/03 <br />tlruwnrbY <br />JWD <br />RE <br />REVISIONS BT PROJECT E <br />Fll�nam� <br />Foo[IHT Pro]�cl <br />04932 <br />PER /1 3 <br />BID <br />CONST <br />.h"I Rama <br />TK1-1 <br />AS-BVILT <br />