Laserfiche WebLink
SWRCB, January 2002 <br />4. SPILL/OVERFII,1, CON'rAiNMFNT R()XF.0 _ <br />Page __ of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Uv4 Me �~ rC U <br />Spill/Overfill Containment Boxes are Present, but were Not <br />Tested f� <br />e, <br />�< <br />e <br />Test Method Developed By: <br />'i Spill Bucket Manufacturer <br />M16ndustry Standard U Professional Engineer <br />n Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum ^EM <br />ydrostatic <br />_ <br />rl Other (,Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />hF au fl b1� i� 44 '!+.'� z+^B; <br />f <br />W .' • aw S ..., ., 2's4yr-.. <br />nTk,,......'�t;1, ".. <br />r.r'_. _�U. ^: L ' • <br />v <br />�:, a, <br />& ll Box #_ C <br />¢Spill Box <br /># Z <br />Spill BOX #3 <br />C(( Spill Sox # <br />- <br />Bucket Diameter: 2 ` <br />L I <br />Bucket Depth: <br />Wait time between apph•ing <br />pressure/vacunn)/water and <br />7 m 1 h <br />/6, ;t t, <br />„r <br />/(j M h <br />; d am h <br />starting test: <br />Test Start Time: <br />O e <br />d <br />Initial Reading (RI): <br />• <br />• ' <br />- e <br />Test End Time: <br />41 <br />�� ci <br />/ O C <br />0 O <br />Final Reading (RF): <br />, <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />C� <br />Criteria: <br />Test Result: <br />I I Pass _ ail <br />Pass ❑ Fail <br />l_ Pass ❑ fail <br />I Pass I I Fail <br />Comments — (inclucle informatlon on repairs made prior to testing, and recommended follow-up for failed tests) <br />