Laserfiche WebLink
Site Address: <br />F. In -Tank Gauging / SIR Equipment: <br />Date of Testing/Servicing: <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR. equipment is installed, <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />Yes <br />D No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />EJ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />=Yes <br />1 ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h.1; ❑ 0.1 g.p.h.2; ❑ 0.2 g. p. h.2 <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />es <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑�10* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />D N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />bl-Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />i <br />❑ NIA <br />or disconnected? <br />p'Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />EY Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />lyes <br />❑ No* <br />1 Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />