Laserfiche WebLink
3.5 <br />MM <br />North Cal Construction will prepare a report which describes our <br />activities, methods, and findings. The report will be submitted <br />to O.S.A., and will be in a format suitable for presentation to the <br />regulatory agencies. It will contain: <br />*A site plan showing sample locations and location of <br />monitoring well. <br />*Copies of boring logs. <br />*Tabulation of all water level measurements. <br />*Summaries of laboratory analysis. <br />*Copies of all laboratory reports. <br />*Recommendations for final closure. <br />11 <br />