Laserfiche WebLink
S. a. Describe the method that will be utilized to purge and/or inert the tauk(s): <br /> b. Tank/Piping Haulear.,,, <br /> Name &I LXLafTV <br /> Address City Zip <br /> Phone No.( ) <br /> Hauler Registration# (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name <br /> Address City Zip <br /> Phone No.( ) <br /> EPA M# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> V" Cali.. -11 �..... . <br /> 10. Describe how the excavation wlfi be backfilled with suitable material upWi removal: <br /> 11. Handling of excavated soil: <br /> a) What material will be used to fine the tank pit and cover the stockpile? <br /> �1-2 M P&LI <br /> b) What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Wastee Hauler. / <br /> Name (n lel k' 7--9,1W <br /> �En U i o ak <br /> Eb r ReD�a�kttadina# <br /> Address ,as 3 I Fa x-) L7 t i-I City�n Q LA Zip�o�S <br /> Phone No. (3/ O T�C� <br /> Page 5 <br />