Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> 490-54b <br /> J8 1.CONTINUOUS ELECTRONIC MONITORING [12.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(SSeeci : <br /> ---------------- -- - <br /> ----------- ----- <br /> PANEL MANUFACTURER`S C(tMg>,Z _eppT 490-55----- MODEL#: T L S <br /> 490-56, <br /> ------ -------------------------------- <br /> LEAK SENSOR MANUFACTURER: MODEL#(S): LJ L_) — 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS I9 a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS �11.SINGLE-WALLED [:12.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: `ago baa <br /> UDC INTERSTITIAL SPACE IS MONITORED BY_❑ 1_LIQUID _❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED�23 CCR 2644 <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS_ 490-66 <br /> ----------------------------------------- ------------------------------- ---- ---- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. A___A910 <br /> VIII.RECORDKEEPING I 117! <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 4go-68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68o <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records. 490-68e <br /> ❑ATG Testing results(and supporting documentation records).ago-bsf E] Corrosion Protection 60-day logs ago-bsg <br /> MdR 0 1 *223 <br /> Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING SAN JOAQUIN COUNTY <br /> �J Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a ENVIHUNMENTA DEPARTMENT <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> LN THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> �f OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.694 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> ® STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)N) <br /> for performing the monitoring and equipment mai tenance: <br /> NAME J1N � 490-72 TITLE C Zl t(�I��lZ �':+ 490-73 <br /> NAME 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/ f any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the infopdation provided herein is true and accurate to the best of my knowledge. <br /> APPL SIGNATUR 4904490.776 DATE: 7� <br /> REPRESENTING: I.Tank Owner/O razor Authorized Re resentati.c or Owner <br /> APPLICANT NAME(print): 490-78 ,APPLICANT TITLE: av°-7e <br /> l/✓ SI^��L�l Z- (_.OvTLT Z��C�l✓�S IZ—� /I <br /> UPCF UST-D(12/2007)3/4 ��L� �� A / ��� 11 21) <br />