Laserfiche WebLink
�i BEFORE PENETRATING FIBERGLASS <br /> WALLS ENSURE THAT THE DOUBLE WALL FRP <br /> SUMP IS HOLDING VACUUM AND UNDAMAGED. <br /> It is REQUIRED to visually check the Vacuum gauge on each <br /> and eve Bravos stems Double Wall product and write on its <br /> every Y <br /> FAX report Vacuum level, name of observer, and date for <br /> every DoubleWall Sump. <br /> WARm AN I Vm 0 ■ <br /> ■ <br /> IF ANY OF THE FOLLOWING OCCUR <br /> A) Adhesive that is not Bravo-Approved is used to install the F-Series fittings. <br /> B) On DoubleWall Models, RobRoy PVC-Coated or hot dip galvanized conduit is not used. <br /> C) On DoubleWall Models, the boot with clamps is not installed with the appropriate adhesive. <br /> D) F-Series Fiberglass Electrical Penetration Fittings are NOT installed by a Bravo Certified Contractor. <br /> E) F-1X-RR models that require RobRoy PVC-Coated Conduit are installed with any other <br /> brand of PVC-Coated Conduit other than RobRoy. <br /> F) The F-Series Fittings are applied to Fiberglass Sumps that are not Third Party Approved. <br /> If there is any indication or suspect damage, you must mark the freight paperwork <br /> "Suspect Freight Damage" as directed by your Contractor Warranty sheet. <br /> kd <br /> --r <br /> ALL SUMPS AND BRAVO SYSTEMS FIBERGLASS F-SERIES <br /> FITTINGS MUST BE KEPT FREE OF CONTAMINANTS, <br /> ESPECIALLY DIRT AND WATER OR MOISTURE. <br /> APPLY MEASURES TO KEEP THE INSTALLED FITTINGS <br /> DRY WHEN LEFT OVERNIGHT ON-SITE. <br /> 4 ii-F-Series-1X-SS-D-11A <br />