My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B) FACTOR , GLUING RECOMMENDATION <br /> B.1 ) Your Bravo FRP rigid penetration fittings should be clean and COMPLETELY DRY AT ALL <br /> TIMES. All pre-abraded or milled areas should be inspected for debris and inconsistencies. No dirt, <br /> grit, water or other foreign material should be on or inside the fiberglass fitting components. <br /> B.2) If you have room, you must lay your Fiberglass UDC on its side, preferably on some pallets <br /> or other raised platform. You will need easy access to the interior. <br /> DO NOT DAMAGE THE SUMP! CAREFULLY LAY THE SUMP ON ITS SIDE <br /> , ` tj <br /> AND DO NOT ALLOW IT TO FALL ANY DISTANCE TO THE GROUND. <br /> USE SMITH TM ADHESIVE ON SMITH TM PIPE Or <br /> AMERONTM ADHESIVE ON AMERONTM PIPE ONLY <br /> 13.3) You do NOT need Bravo Clamp tools for this factory-install method. <br /> B.4) Follow your adhesive manufacturer Instructions to mix and apply your <br /> adhesive. One bag of fiberglass filler is to be fully mixed with each 6oz adhesive kit. (Pg. 3) <br /> DO NOT ATTEMPT TO MIX MORE THAN ONE KIT AT A TIME. <br /> B.5) Main body first - carefully apply a generous amount of adhesive to the wall and the face that <br /> will meet the wall (Fig. 135). Place fitting into the hole and briefly press it down so some adhesive <br /> oozes out 3600 around. ALLOW TO CURE FOLLOWING THE PIPE MANUFACTURERS ADHESIVE INSTRUCTIONS. <br /> B.6) After full cure. Turn the UDC over on its opposite side and ensure the abraded surface on the <br /> interior of the sump is clean and dry, ready for adhesive gluing. <br /> MAKE SURE TO NOT DAMAGE THE FITTING THAT HAS BEEN INSTALLED! <br /> DO NOT LAY THE SUMP ON THE GROUND WITH A FITTING INSTALLED! <br /> Fig. B5 <br /> THE INJECTION PORT <br /> MUST FACE 12-0-CLOCK, <br /> Adhesive TOWARDS THE TOP OF <br /> 3600 SUMP (OPENING) <br /> Around <br /> INSIDE OF SUMP <br /> 7 ii-F-Series-TS-D-13A <br />
The URL can be used to link to this page
Your browser does not support the video tag.