Laserfiche WebLink
I <br /> 16.1.7. Measure the sump to ensure it is the correct length for 17.ADDING TANKS AT EXISTING LOCATIONS <br /> intended burial depth. For further instructions,see the Xerxes 17.1. GENERAL <br /> supplement applicable for the specific containment sump - <br /> being installed. See SECTION 20 for list of supplements. 17.1.1.Additional Xerxes tanks may be installed at existing lo- <br /> cations if proper foundation support exists. <br /> 16.2 FINAL CONTAINMENT SUMP INSTALLATION <br /> 17.1.2. Backfill support around the existing tanks must not be <br /> NOTICE disturbed. <br /> Make sure that no heavy objects are allowed to distort the 17.1.3. It is the responsibility of the tank owner to choose the <br /> containment sump top after final assembly.This includes the method of installation. III` <br /> street box and concrete pad.No weight should be trans- <br /> ferred to the tank. Failure to follow this notice may result in 17.1.4.Xerxes requires that one of the following methods be used. <br /> property damage. 17.2. PREFERRED METHOD <br /> 16.2.1. Backfill to the top of the containment sump system. 17.2.1.The preferred method is to install new tank(s)in a sep- <br /> 16.2.2. Backfill around the outside edge of the containment arate hole if space allows and/or if existing tank(s)must re- - <br /> sump, making sure that no backfill is on top of the contain- main in service during installation of the new tank(s).The <br /> ment sump.See FIGURE 16-1,Area A. preferred method is described here.See FIGURE 17-1. - <br /> 16.2.3. Isolate the containment sump from all traffic loads. <br /> 36" <br /> 16.2.3.1.The contractor must install a concrete form/barrier to - �- <br /> fill 'u .' .. . .Ilu itIIIIK <br /> allow a minimum 3-inch clearance between any load-bearing <br /> item(for example,the concrete pad/street-box frame)and the - <br /> I <br /> containment sump top. u�illllu- <br /> _� <br /> No backfill on top of containment sump <br /> Street Box ° <br /> Surface Pad - <br /> Barrier Backfill <br /> ❑D © © ❑A <br /> 1 1 FIGURE 17-1 <br /> 17.2.1.1. Install a new tank in a separate hole at least 3 feet <br /> from the original hole. - <br /> %;',' /,,; _ �'�• 17.2.1.2.Follow procedures outlined in this Installation Manual. <br /> 17.2.1.3. Keep heavy and/or unusual surface loads off existing <br /> •� %%-' ':�i,'%i' "' tanks when excavation hole is open. <br /> Typical Installation <br /> (watertight cover shown) <br /> 17.2.1.4. Maintain the natural barrier of undisturbed soil be- <br /> •'i %; %i' tween tanks. <br /> 17.2.1.5.See SECTION 7.5.for minimum spacing require- <br /> ; <br /> ments between tanks. <br /> NOTE:Sufficient soil must remain between the excavations <br /> so that the backfill in the original excavation does not shift. <br /> FIGURE 16-1 <br /> 16.2.3.2.Typically,a sheet of plywood(or other material)is 17.3. ALTERNATE METHOD <br /> used as a barrier and is set on the backfill to ensure that there 17.3.1. If the preferred method outlined above is not possible <br /> is at least a 3-inch clearance above the containment sump or practical,an alternate method is described here.See FIG- <br /> top.See FIGURE 16-1,Area B. URE 17-2. <br /> 16.2.4. Choose a street-box size that allows enough clearance <br /> around the containment sump top opening for proper opera- <br /> tion of the cover. x- <br /> 16.2.5. Set the street box,and check for clearance to allow uil - <br /> access and space to remove the watertight cover.See FIG- <br /> URE 16-1,Area C. illi) a-I. <br /> -- <br /> 16.2.6. Continue with backfill, as required,to subgrade.See <br /> FIGURE 16-1,Area A. IT I - <br /> i <br /> 16.2.7. Maintain good drainage of water away from the access <br /> opening of the containment sump top when installing the sur- <br /> FIGURE 17-2 <br /> face pad.See FIGURE 16-1,Area D. 17.3.1.1. Bury additional tanks in the same installation hole. <br /> 24 <br />