Laserfiche WebLink
------------------------- <br /> F <br /> APPEN©IX C: XERXES SPLIT BACKFILL INSTRUCTIONS <br /> I <br /> C1.GENERAL 02.5.Secondary backfill must be compacted to achieve a mini_ � <br /> 01.1.Use select rounded or crushed stones for primary backfill mum of 85 percent standard proctor density. kti: <br /> material as specified in the Xerxes Installation Manual in effect at 02,5.1.Do not use rammer-type compactors over the top of the F? <br /> time of installation,and the Xerxes APPENDIX B(and supplement), tank. <br /> Primary Backfill Requirements. i <br /> 02.5.2.Some tank owners may require sample testing and written <br /> 02.SPLIT BACKFILL INSTALLATION reports to verify the compaction of the backfill. <br /> C2.1.Use the primary backfill material vertically up to at least 75 C2.6. Material must be installed in 12-inch to 24-inch lifts compat- <br /> percent of the tank diameter.See FIGURE C]-1. ible with the compaction equipment used. <br /> C2.2.Follow the instructions in SECTION 6 of the Installation C2.7. In some conditions,frost heave may be encountered when F: <br /> Manual on the placement of this backfill motorial. using secondary backfill.Therefore,consider any problems that <br /> 02,3.Instal[a layer of geotexti[e filter fabric over the entire surface may occur. t= <br /> of the primary backfill material.See SECTION 9 for more informa- C2.8.Specifications for secondary backfill material and com- <br /> tion about geotextile filter fabric. paction above the fiiter fabric may be determined by the require- <br /> C2.3.1.All joints in the filter fabric should be overlapped a mini- ments of the piping,surface slab or roadway. <br /> mum of 12 inches. 02,9. Refer to applicable codes or standards for base course and <br /> C2.3.2.Geotextile fabric must overlap onto the tank and excava- sub-base course material and compaction requirements. <br /> tion surface a minimum of 12 inches. 02.10.The following are examples of acceptable secondary back- <br /> C2.3.3.Installations with unstable soil may require that the fabric fill material: <br /> line the entire excavation.See SECTION 9 for specific information 02.10.1.clean native backfill <br /> about using geotextile filter fabric in unstable-soil conditions. C2.10-2.coarse sand or grave[ �= <br /> C2.4.Clean native backfill may be used as secondary backfill ma- G2.11.One hundred percent(100°/0)of all backfill material must <br /> tori al above the geotextile fabric to subgrade. <br /> pass through a 1-inch sieve, <br /> 02.4.1.Secondary backfill material must be clean,free-flowing, <br /> and free of large rocks,roots,organic materials,debris,ice and <br /> snow.Backfill material shall not be frozen or contain lumps of <br /> frozen material at any time during installation. <br /> FIGURE C1-1 —Split Backfill Installation l <br /> e: <br /> Grade or subgrade <br /> Secondary backfill <br /> material III <br /> 114! IIII <br /> Filter fabric with a <br /> IIII Illi ` <br /> minimum of 12" overlaps IIII 111 <br /> IIII ' - <br /> II <br /> IIII � � IIII <br /> IIII J I-III 75% of tank diameter <br /> Primary backfillMI <br /> III^III I 1' <br /> id <br /> material IIII - x . ;'.'' 12" bedding rr <br /> IIII.= IIII:-1111 �1111 `IIII� IIlI=1111`III E <br /> t- <br /> I� <br /> 29 <br />