My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G: <br /> CORE STATES Davin M. Leiffer,P.E. <br /> -_VMM 1700 W. Industrial Drive, Suite B <br /> MMM, Rogers,AR 72756 <br /> G R o u p (479)986-4400 fax:(479)986-4401 <br /> e-mail: dleiffer0core-eng.com <br /> M{MEED <br /> i�PEISan Joaquin County EHD Review Response (deficiency letter#2) <br /> 0. <br /> COBE STATES GROUP November 25, 2013 <br /> 1700 West Industrial Drivel Rogers,AR <br /> 72786 <br /> Ph:478.9�P6.4400 FX'.479.986.GA01 p This letter is written in response to comments dated 11122113. <br /> civil I mechanical I electrical PROJECT: Pilot Bio-Diesel <br /> land development i branded Image 1501 North Jack Tone Road <br /> program management I permitting <br /> construction management Ripon, CA 95336 <br /> Atlanta,GA I Somerset,NJ I Boston,MA <br /> Saint John,NB(GAN)I S1.Louis,MG TO: Jerrod Herron <br /> Tampa,FL I Charlotte,NCI Boca Raton,FL <br /> Rogers,AR I Los Angeles,OA <br /> Review Response: <br /> w�.c eng.com #2–The plans do not include a vent rack transition sump. Explain how the plan will <br /> comply with chapter 6.7 of the California Heal and Safety Code. <br /> Response: Specified 3"Ameron LCX Coaxial vent pipe is hydrostatically monitored. <br /> Specified sump is double wall hydrostatically monitored. Specified sump sensor is a <br /> non-discriminating sensor programmed for positive shut down when in alarm. <br /> #3–Plans do not include continuous monitoring for the secondary containment of the <br /> product, vent, vapor piping. <br /> Response: Cut sheet provided for 3" Ameron LCX in this submittal. Additional <br /> hydrostatic monitors proposed for all new piping being installed. The biodiesel is <br /> delivered to the injection system in a double walled, continuously hydrostatically <br /> monitored conventional suction system. <br /> E <br /> #4– The secondary containment sump within the injection shed does not contain all of <br /> the piping and attached equipment. <br /> Response: NEF cutsheet and Affirmative Statement of Compatibility provided in this <br /> submittal. Specified sump sensor is a non-discriminating sensor programmed for <br /> positive shut down when in alarm. Refer to note 141PP5. <br /> k <br /> #5–A complete Unified Program Consolidated Form (UPCF) for Underground Storage <br /> Tank information was not submitted. <br /> Response: Sump is shown on detail 01/PP1.1. Biodiesel line is conventional suction. <br /> Form corrected and attached. <br /> #6–Manufactures'cut sheets for tank,piping, and equipment were not submitted. k <br /> Response: Additional Cut sheets to be submitted with this resubmittal a <br /> Best Regards, <br /> David M. Leiffer, P.E. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.