My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Don K. Mukai <br /> MECHANICAL ENGINEER <br /> 1841 Paloma St. Pasadena, CA 91104 <br /> 323-888-4136 <br /> December 3, 2013 Revised 12.09.13 <br /> Ms. Paola Bravo <br /> S. Bravo Systems, Inc. <br /> 2929 Vail Ave. <br /> Commerce, CA 90040 - <br /> Re: Specification approved by a state registered professional engineer <br /> CCR Title 23,Division 3, Chapter 16,Article 3, Section 2631(d) <br /> This letter is for an engineering specification review and approval of a secondary <br /> containment system component which is not an integral part of primary containment for an <br /> underground fuel tank storage system in California. The authority for this approval comes <br /> from the California Code of Regulations (CCR) Title 23, Division 3, Chapter 1.6,Article 3, <br /> Section 2631.(d). <br /> I have examined and reviewed the following specifications for the B-830 Commercial Series <br /> transition sumps: <br /> 1) UL.com Certification Directory EGVV2.MH26018 for AOC Vipel F-764 and 774 resins <br /> 2) UL.com Certification Directory Category EGVV2.guideinfo <br /> 3) UL.com Certification Directory Standard ANSI/UL 1316 <br /> 4) AOC Vipel Product Selection Guide <br /> 5) AOC Vipel Corrosion Resistance Resin Guide <br /> 6) Bravo Systems Sump Wall Specifications document Bravo_SumpWallConstSpec_2013 <br /> 7) Bravo Systems datasheet B830-SW-Commercial and B830-DW-Commercial <br /> 8) Bravo Systems datasheet B407-RB-13B and B409-D-AB-13A <br /> 9) Bravo Systems datasheet SNAP-SERIES-13A <br /> 10) Bravo Systems installation manuals for the B407-RB and B409-D-AB products <br /> 11) Representative B407-RB,B409-D-AB, B833, B834 and B835 transition sumps <br /> 12) Detailed drawings of B407-RB,B409-D-AB,B833, B834 and B835 transition sumps <br /> 13) Bravo Systems Factory Certificates for both SingleWall and DoubleWall products <br /> 14) Bravo Systems Alternative Fuel Compatibility letter for containment sumps R3 <br /> 15) Bravo Systems document Bravo 30Year CorrosionWarranty <br /> 16) Bravo Systems UL Approval document UL—BRAVO—B400—SERIES <br /> 17) State of Florida DEP Approval document F'DEP-EQ615-SW-DW <br /> The B830 series sumps are four-wall variants of the established UL Listed SingleWall B407-RB and <br /> DoubleWall B409-D-AB transition sumps, which have octagonal walls. The B830 series was <br /> established to allow Bravo's architectural & engineering community to specify the length and height <br /> of the containment sump at the time of order to accommodate a wider range of applications. <br /> Continued on Page 2... <br /> i' <br /> 3RP-B830-Commercial-Series PAGE 1 of 2 <br /> i <br /> i7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.