My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014 B100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
INSTALL_2014 B100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 11:07:34 AM
Creation date
11/5/2018 3:05:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014 B100
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\1501\PR0505264\INSTALL FILE B100 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address:Pilot Flying J^-1501 N.Jack Tone Rd.,Ripon CA <br /> rye <br /> a aapemm <br /> P=MamanP�ua4o!Pi,M <br /> 5 9PMP! <br /> Sip=NNdle Sump <br /> i v.Vil <br /> Y= Bua Vapo,Hwhi <br /> ,1--Nnula 9ww <br /> MFAM1amaYcimRpagn <br /> y' iSiRns4d,Stlop. <br /> e VioMut4mes- <br /> VmtlMes <br /> Vapor Line — — i <br /> A CA1=CIemiil SePe,aim <br /> VY=+IIOILNMr <br /> `� Eb,R/W 8!P(Y2<TOM�d SonaWILArt <br /> ¢� LUIIOWnw ,u, <br /> a� <br /> Y � v <br /> V <br /> 11 <br /> �r <br /> Ile <br /> k � <br /> I <br /> d <br /> 4 t <br /> m <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include It,rather than this page,with your <br /> Monitoring System Certification.On your site plan,show the general layout of tanksand piping.Clearly identify <br /> locationsof the following equipment, if installed:monitonng system control panels;sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spilt containers,or other secondary containment areas;mechanical or electronic line <br /> leak detectors;and in-tank liquid level probes(if used for leak detection),In the space provided,note the date this Site <br /> Plan was prepared. <br /> Page 5 of_ RECEIVED <br /> APR 16 2014 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.