My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
35
>
2300 - Underground Storage Tank Program
>
PR0516243
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 8:21:27 AM
Creation date
11/5/2018 3:19:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0516243
PE
2381
FACILITY_ID
FA0012529
FACILITY_NAME
STORAGE YARD - JOE OMACHI
STREET_NUMBER
35
STREET_NAME
JACKSON
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
147-19-010
CURRENT_STATUS
02
SITE_LOCATION
35 JACKSON ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACKSON\35\PR0516243\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERT:FICATE <br /> P:ojec[I.ocarion <br /> 35 E. Jackson St . , Stockton, CA <br /> Owner Joe Omaehi phone No. (209)368-6175_ <br /> Contractor <br /> Jim Thorpe Oil, Inc. Phone No. (209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Repot-,w',thun 30 days of project completion, or <br /> X 2 Submission of verifiaaion, e.g.,,load ticket, within 30 days of project complerion that one of the following materials wcs <br /> placed m the excavadon in 12' ifa: <br /> X A. Pea gravel—smooth, rounded material not more than one-heif(1!2) itch in diameter <br /> B. Crushed rock•-self-compacting material not more than hreetluartors '(314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for-backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby terrify that a Soil Engirv='s Compaction Report will be submittea within 30 days of project completion. or submission.of <br /> verification that the select material desc:tbed above will be placed at a m:nimimt of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Cbapter 70. <br /> Richard Thorpe <br /> Name <br /> Contractor <br /> e <br /> signs=-- <br /> Shall be the :esporuible managing eirployee on the license or authu:ized spent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.