Laserfiche WebLink
(OPENINGS IN SLAB 10 HAVE: 1-1/2 GROWN) <br />28 B" k <br />18 2" _ —112'1-44 I 5'-2" X. <br />11 \CA <br />iK3 -5 (1YP. -ANNL1LAfi INSPECTION WELL <br />MONIFYURZ `. <br />co <br />n, <o FF1 T <br />r 7v, <br />r <br />YSTAGF. SII OR RECOVERY ALL MANHOLE ACCESS COVERSac,5 1�- <br />` ) TO BELOW GRADE SHALL BE <br />-- - - - _ IQUID TIGHT AND LOCKABLE _ <br />t �TYP.) <br />-A.r, PAVING <br />18" 1 2" <br />..r - 's` - �TY1 �AL�.)TYP. (fYV ALL) 78" <br />k <br />r> - .TK3-57 <br />-- <br />m <br />SLAB ` i RECOVERY (STAGF. Q <br />F <br />_�-TEMP ALIGNMENT SPACER--� <br />1 - - �2�---Y- ATTACHED IN FIELD IN <br />---- -CONTROL r1E0 TO MANHOLE SKIRT o <br />EXPANSION '- _ --- TYP. OF 4) TO BE REMOVED <br />J'TOOLED': WITH OINTS TO BE : -AFTER INSfALlATION <br />.n <br />NOTE: <br />SrA E u. <br />.- <br />-y€NI&APOR RECOVERY ALL IMNHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A 1-1/2" CROWN OF CONCRETE <br />( G ) T 0 PREVENT WATER INTRUSION INTO THE MANHOLE, THE ARCO FIELD ENGINEER WILL BE REQUIRED <br />TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE <br />PAID. CONTRACTOR WILLBE REQUIRED TO REINSTALL ENTIRE DRIVE SLAB AT OWN EXPENSE IF <br />6"-4/4 WWM - THIS DESIGN REQUIREMENT IS NOT MET. <br />r - 1 0 (.L mFER <br />-- (TYP) <br />�tyg�y3 REBAR CAGE IOP £r Ygp+�y <br />INSPECTION HELL .'A OETWFFN FILLS -ALLTA AROUND COVER <br />TYP. <br />/n� _" ���� '� � <br />K3 -gl �� -- - . -- -�-� <br />NOT TO SCALE: - <br />r6111�R 0!6✓<M <br />NOT TO SCAI E• <br />FILTER FABRIC ON BOTTOM FITTER FAIDPIC <br />OF TANK HOLE-- EE NQTF NO. 1 REQUIRED DEADMAN DIMENSIONS <br />IN UNSTABLE (AS DEFINED <br />REPORT BY SOILS _ <br />SOIL IHF DIMENSION— <br />MUST, BE 4FT FROM BOTH SIDES TANK DEADMAN DEADMAN DEADMAN <br />AND ENDS (WITH FIDEItGLASS TANIaS) EANk SI"l_C LENGTH LE TNT�7GTTH HEIGHT WIDTH NOTE: <br />���rrr��� }• 0" )Ai -PLOT V 'PL P ARCOND TAG FSIR QFLOLN WALL PITH COVER BLACK <br />-. - <br />MIN"I �'-' - �"- _-'--_ -�- PROPER PRODUCT I.D. TAG. DISTRIBUTION <br />10 FT-. DIA IS RESpQNS18L.E FUR TDF-NTIFYING THF. TANKS <br />LQOOO. GAL 5J 8 3/4 78 8 3/Q" 12" 19 WITH A.RL COLORS. <br />NOTES: <br />- � (1) FILTER FABRIC(DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED. <br />y FABRIC MUSE k T€NO V ABOVE MAX. HIGH WATER TABLE <br />AND MAY BE PINNE9 TO SDE OF HOLE WITH WIRE, ETC. SEAMS <br />. iti ..�i. _ MUST BE LAPPED. 1 • MINIM M. - 0,( <br />^/' 1 a ggw�ys� p1 (2) TANK .MUST B6 1 LCASTED BY FILUNG WITH WATER UNTIL 13ACKFILL - O <br />I l .i*'�1 c ori 7Cg, for COMPLETE, f:AUT10la, DO NOT FILL FIBERGLASS TANK WITH � �•'�.� <br />t + <br />LIQUID UNTIL BACKFILL IS EVEN WITH TOP. SEE SPECIFICATIONS \\\ <br />C:)INOT <br />-q Diameter hanks WHEN INSTALATION'IS COMPLETED, WATER IS TO BE COMPLETELY <br />PUMPED OUT& MOPPED DRY SO THAT NO PROBLEMS OCCUR w/ STANDARD DETAIL FOR 10" 12" <br />. ttPHASF' SEPARATION DURING WINTER OXYGENATED FUEL SENSOR. OR 14" ACCESS COVERS. NO <br />Tp SCALE (3) UFADMEN TO BE INSTALLED IN A WE HALE OR WHEN REQUIRED •® OTHER MARKINGS ARE PERMITTED. <br />• BY OWNERS ENGINEER OR AUTHORITY HAVING JURISULCTION. <br />WHEN REQUIRED, THE ANCHORING SYSTEM SHALL BE IN <br />COMPLIANCE WITH AUTHORITY HAVING JURISDICTION. <br />FIBERGLASS TANK <br />(4) WHEN GROUNDWATER LEVEL IS ANTICIPATED TO 'BE WITHIN 5 FT. - <br />- -- OF GRADE CONTRACTOR SHALL NOTIFY ARCO FIELD ENC NEER <br />-- --- CONCRETE "OFAOMAN", • WHEN MORE FOR DIRECTION ON ANCHORING. METHOD TO BE USED. �D ADMAN STAGE I VAPOR RECOVERY <br />THAN ONE TANK IS INSTALLED THE OR. ANCHORING SLAB) <br />DEADMAN BETWEEN TANKS SH LL BE <br />1, _E IN WIDTH -TO ACCOMMODATE (5) WHEN ENGINEERED SHORING �IS REQUIRED DUE TO SI rE <br />STAGE I VAPOR <br />FOTO PART THE TANKS <br />K(S>EIEUCHART) 14 ER OCKNDE S POAND RTING EE` FILING <br />PENGGN S LALLING BECALCULATIONSVAB FILL PORT -- 6' ACCESS PORT <br />A STATE CERTIFIED ENGINEER. <br />- - '- - FIBERGLASS HOLD-DOWN STRAPS <br />FURNISHED BY TANK MFR. <br />& PLACED AT GESIGNATFD ` 4"x4" HIOH'NAY REFLECTOR MADKR FOR <br />LOCATIONS. (NUMBER AS REQUIRED) - ,,,���/// DD FC IO <br />Sty <br />PRODUCT I ENTI I AT N. C L ER <br />BALLAST TANK 3/4" WIRE. ROPE W/---- INSTALLED UYDACO•DFS fRx©U(IONNTEU <br />IA, WITH WATER ONLY T IPLE V CLAMP 8" ACCESS PORI - <br />(IF REQUIRED), COVER ENTIRELY W/ TO BE ORIENTATED THIS AREA TO <br />LIBERAL'.. COAT OF TO THE SAME SIDE v REMAIN BLACK <br />ASPHALT CEMENT AS TANK LEVEL GAUGE <br />4LRFOf2 FId <br />A <br />FESTRAP _ •--WHEN DEADMAN <br />IS PRECAST OUT API STANDARD COLORS. <br />OF fhg HOLE ADD - --- --- <br />- 2 J3 REBAR - --- - ONE #3 REBAR IN UNLEADED PREMIUM 92 OCTANE -• RED <br />FULL LENGTH --- EA4;li COVER (4) UNLEADED 87 OCTANE -'WHITE <br />Ic W/ 24 COVER UNLEADED PLUS 89 OCTANE - BLUE <br />METHANOL - GREEN <br />B i I, ----SEE CHART FOR DEADMAN <br />DIMENSIONS <br />TYPICAL FOR 10' DIAMETER TANKS` <br />Typical Tank Anchoring Access Cover ld�niifi�ation <br />�r d (0;� I onhection 0-tandard Two Point 'Fill <br />17 <br />18-- <br />NOTNOT T <br />'TO SCALF: - O SCALE: - <br />+Qa...nw'w..a,,.m�,�......�...d,e;�n......:=:�amm.—--..."."...".. �., �.�=a=w._,.,m.,...•e�.�.,..,®..e.� - :.�n„c,... �..a,..,,�roem... <br />e 2020 35A <br />At I • <br />T�. <br />.'� <br />— 8" CONCRETE TANK SLAB- <br />18" - <br />W/ 6x8/#4/4 WWMJ r <br />_ y <br />A.C, PAVING <br />3" MIN. •. �.-_.._ (,�Cn gto <br />,\ �a <br />-, 3 TOP & BUITOM <br />ROUND ALL PENETRATIONS (IYP) <br />i <br />. 4< <br />r�d <br />DATE I REVISIONS <br />FILL PORT <br />T}KODU�T IDENTtrICAf10N�t2 COLO�f D FOR <br />PER API SL1W]ARD`3. EPDXY MOUNTED <br />INSTA.I_LED BY ARCO, UISTRIBUTIUN <br />-•-THIS AREA TO <br />. REMAIN BLACK <br />PROJECT RELEASE <br />--- --- `PERMIT 6/27/97 <br />BID <br />IANST. <br />AS -BUILT <br />Q� <br />j fy3 <br />P its ,3� <br />n Paw <br />L x <br />E <br />r <br />�A��� 99 <br />. �n /� G <br />,�� `Ayes': r <br />mai' <br />G`TJ'VU V uatelFO <br />10275 72ND 4Yd1VE SQUIB <br />xuif) i <br />h?V Gfo pon <br />1208 <a-3222 <br />,r <br />mo9ler raleu5eidote <br />3/18/97 <br />pr0j. exe. ^dravn by - <br />6/20/91 SHK <br />proj—ell t-Jy�facllity —��— <br />(3,147 <br />vneet %/file-. T � <br />— <br />—,-,..,.-,.v°;.," jJ <br />