My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 UST PIPING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2002 UST PIPING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 1:35:05 PM
Creation date
11/5/2018 3:21:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 UST PIPING
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\J\JOE POMBO\2430\PR0506796\UST PIPING 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Azmv'�'s s a000m <br /> Sp <br /> ie 'z � �e1i?Sm'm <br /> 910art <br /> li y C1 <br /> °�- µav�raAn Ave <br /> SAN JOAQUIN COUNTY ',o._ � - Antons C{ <br /> ENVIRONMENTAL H EALTH DEPARTMENT ., <br /> JOB SITE COPY 21I Came;lliaflt y <br /> GrahtLNe.P.d <br /> Duncan DT o - <br /> SAN JOAQUIN COUNTY PO - - m aT N O <br /> ENVIROI�r1ENTALFiFJLLTHDEPARTAOENT ,to4e T MaryAlceway a S �' a O y <br /> 3p6 EWESER AVE THIRD FLOOR <br /> = o <br /> BP West Coast Products �� 5 JonniLPanchDr s a � M <br /> q '42Q I� Hilcrast Dr ffi, �71TE K l o —J V •v Q U <br /> ❑_/APPMn4 � Janni Ln w T <br /> E! APDrwiedWilit t So P Tamml Ct Ni�: Q <br /> ❑ DIBa Sea Rama" 02002 NHpquestmm20 <br /> , Inc.;® 22 GDT, mo. -+— o 4- r.,pPravaA: vF V = CO <br /> Remarks <br /> Piping Modification ------- VICINITY MAP 0 m � �Q <br /> Uate1�{..�2 z By �" <br /> ApprovatYxtendsonytothatwhichW` how^a^AdeacAbad t L <br /> r <br /> hereon and does not authorize or approys any omission or m _F_- .,r•.i-,tn laws or local ordinances. <br /> deviatior G++- <br /> 30 Q) <br /> N U <br /> U? <br /> O _ �_ <br /> COMPLIANCE NOTES PROJECT DATA -4- M <br /> ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR SCOPE OF WORK W <br /> REFERENCING ALL DIMENSIONS, PROPERTY LINES, ELEVATIONS AND EQUIPMENT O <br /> LOCATIONS. THE SCOPE OF WORK FOR THIS PROJECT WILL BE TO INSTALL A <br /> ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE NEW ACTIVE SIPHON LINE. THIS WORK IS REQUIRED PROVIDE A <br /> REPAIR TO THE EXISTING SIPHON LINE, WHICH IS NOTT <br /> FIELD BEFORE STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO FUNCTIONING PROPERLY. Q <br /> THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE m <br /> PROCEEDING WITH THE WORK. <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM THE DIVISION OF <br /> INDUSTRIAL SAFETY, STATE OF CALIFORNIA, FOR EXCAVATIONS OF TRENCHES d <br /> 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br /> GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING PROJECT CWNER: SP WEST COAST PRODUCTS <br /> AGENCY PRIOR TO TANK INSTALLATION. OWNERS ADDRESS: 4 CENTERPOINTE DRIVE <br /> TANK SYSTEM TO BE INSPECTED BY GOVERNING AGENCY AND BP ENGINEER AT LA PALMA. CALIFORNIA 90623-1088 <br /> FOUR (4) SEPARATE CONSTRUCTION PHASES AS REQUIRED: OWNERS PHONE NO. (714) 670-5300 J <br /> PROJECT ADDRESS 2295 WEST GRANT LINE ROAD <br /> 1. PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 TRACY, CALIFORNIA <br /> MINUTES. OCCUPANCY: M (BLDG.), S-3 (CANOPY) <br /> 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN CONSTRUCTION TYPE: V-N <br /> ACCORDANCE WITH MANUFACTURER'S GUIDELINES. SITE AREA: 40.500 SQ. FT <br /> 3. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE CONVENIENCE STORE AREA: 2,858 SO. FT. <br /> HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS CANOPY AREA: 3,584 S0. FT. <br /> TO INSURE THAT THAT THE SUMPS ARE WATERTIGHT. THE BP FIELD ENGINEER <br /> MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION TEST CHECKLIST <br /> BEFORE CONTRACTOR WILL BE PAID. <br /> 4. FINAL INSPECTION, INCLUDING ALL PORTIONS OF THE LEAK DETECTION <br /> SYSTEM. <br /> O <br /> TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS O <br /> FORWARDED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM <br /> BEING PLACED IN OPERATION. <br /> ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE DRAWING LIST C <br /> AS PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING J <br /> AUTHORITIES. <br /> T1-1 — PROJECT TITLE SHEET <br /> TK1-1 — STORAGE TANK & PIPING SITE PLAN <br /> GENERAL NOTES TK3-2 — PIPING ARRANGEMENT & INSTALLATION DETAILS N <br /> TK3-5 — TANK SLAB, IDENTIFICATION MARKING <br /> A. ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED AS SHOWN ON O <br /> TK4-3 - MATERIAL LIST, ABBREVIATIONS, <br /> BP TANK DRAWINGS (TK-SERIES) AND BP MASTER CONSTRUCTION <br /> SPECIFICATIONS (SECTIONS RELEVANT TO THIS PROJECT). TANK ORIENTATIONS AND GENERAL NOTES V <br /> O <br /> B. THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO j U <br /> BE AN EXACT REPRESENTATION OF THE FINAL PRODUCT. GENERAL CONTRACTOR nn�� <br /> SHALL RELOCATE MODIFY, OR ADJUST TO PROVIDE A SYSTEM CONSISTENT W d, <br /> WITH THE INTENT OF THE DESIGN. THE GENERAL CONTRACTOR SHALL PREPARE , Ln U <br /> AS-BUILT PLANS AT THE COMPLETION OF THIS JOB. O O <br /> C. INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS U N V) <br /> AND MONITORING EQUIPMENT AS SHOWN ON ELECTRICAL DRAWINGS. ALL <br /> CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED PER N.E.C. <br /> AND LOCAL REQUIREMENTS. <br /> D. BP SHALL PERFORM LINE TESTING AND AIR QUALITY TESTING. CONTRACTOR <br /> REPRESENTATIVE SHALL BE PRESENT DURING TESTING. Taft&Associates,Mc. <br /> aam.ra Mem.. aura <br /> E. FENCE JOB SITE WITH 6 FT. HIGH CHAIN LINK FENCE DURING <br /> CONSTRUCTION. <br /> ona.rara <br /> Tmxvr�rort,. <br /> F. INSTALL ALL NEW ELECTRIC/SIGNAL CONDUITS TO BUILDING. REMOVE a""i1n�O1a0ii1i�06 <br /> CONDUCTORS FROM OLD CONDUITS, CAP AND ABANDON IN PLACE. n�0°0�00 <br /> tTsgeaadxfla. <br /> G. ALL IMPROVEMENTS ARE EXISTING AND TO REMAIN UNLESS NOTED �ar� <br /> OTHERWISE. PROTECT FROM DAMAGE DESTRUCTION. aairora< <br /> H. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS. �' �FqF�, anftWd a <br /> yy ?�� aygp,t G\•Taa4K <br /> I. INSTALL EXPANSION JOINTS (E.J.) AND CONTROL JOINTS (C.J.) IN ALL NEWta.wn..xv•a.%av <br /> CONCRETE WORK AS SHOWN AND REQUIRED. No. 044786 w.rnao•mr,o <br /> ,y. EX?. 3-3;-21)CGP consultant job# <br /> J. CIRCUIT DISCONNECTS TO OR THROUGH THE DISPENSING PUMP SHALL u}�.rF0IV ;�i AR1596 <br /> DISCONNECT ALL CONDUCTORS, INCLUDING ANY GROUNDED CONDUCTORS PERFO ' /J/oa master release date <br /> N.E.C. 514-5. <br /> project master <br /> K. FIELD ENGINEER TO COORDINATE ALL ON-SITE ENVIRONMENTAL EFFORTS. NO. BP WEST COAST PRODUCTS MASTER REVISIONS axe date drawn by <br /> NO. DATE REVISIONS BY PROJECT RELEASE <br /> Filename <br /> PERMIT fcc06347 t1-1 12-02 <br /> Facility/Project <br /> BID 6347 <br /> CONST. sheet name <br /> AS-BUILT T1 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.