Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK.MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a pertnit before making <br /> the change.Required by CCR 2632(d)and 2641 (h). <br /> FACILITY NAME '��t �` J"1 Y- t"1" �I�-DATE b <br /> FACILITY ADDRESS 114 t <br /> L_�v <br /> I.Name(s) and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> Et—,T-,F— • A <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS Ars t��,��u-�� PIPING <br /> 3.Describe the location(s)of where the monitoring will be performed. ie: location of sensors <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel C-r-, C- <br /> Name and Model of Line Leak Detectors �� '�-)�''C-�L-t✓� 'r � � � �� `��-' �"� ,,�fiP�"Yl-� <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors N <br /> Name and Model of Dispenser Sensors N <br /> t-'1 <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes❑ No P-- <br /> Does <br /> 'Does the turbine shut down if a sensor is disconnected? <br /> Yes 9— No <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No R-- <br /> 6. <br /> '6.How will the alarm history and subsequent maintenance be recorded? <br /> P a ��> ��1 � � t _ — � ,µcm ���_ <br /> east once every 12 <br /> 7.Mairttenance of the monitoring equipment schedule and performed <br /> forlthe monitoring equipment What month will <br /> Describe the preventive maintenance7 Yrs r'� <br /> annual monitoring certification be performed in? <br /> Note:For new installations the Seco war in <br /> itial nm testing bre tosted before January lrZQ4A' <br /> installation. if secondary containment systems <br /> nths <br /> must be tested once every <br /> 36 8.Describe the training necessary for the operation of UST system,including piping, and the monitoring <br /> � <br /> equipment. <br /> IAUnit IIIIUSTImonitoringplan.doc <br /> 5t3o12002 <br />