My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 1998 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 3:47:38 PM
Creation date
11/5/2018 3:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2007
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 1998 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2007
QuestysRecordDate
7/11/2018 4:26:40 PM
QuestysRecordID
3925819
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />-3- <br />other sections of the law, but which UST systems are found to be located within 1000 <br />feet of a well, will be notified pursuant to section 25289, subdivision (b) and will be <br />required to conduct testing within 18 months of notification. <br />ELD means a test method that ascertains the integrity of an UST system. Therefore, <br />regardless of the UST system type (i.e., single -walled, double -walled, or hybrid 3), the <br />entire UST system (single -walled and double -walled) must be tested to fulfill the <br />requirement. <br />What is the process for implementing ELD? <br />As described below, several groups are responsible for various aspects of the process <br />for ELD implementation: <br />SWRCB UST Program Responsibility: The SWRCB UST Program is responsible for <br />notifying owners/operators of UST systems within 1,000 feet of a public drinking water <br />well that they are subject to the requirements of ELD. [Health & Saf. Code, § 25292.4, <br />subds. (a) and (b) §25292.5, subd. (b); §25289, subd. (b); Cal. Code Regs., Title 23, § <br />2640, subd. (e)] The SWRCB UST Program is also responsible for considering requests <br />for reconsideration from those UST owners/operators who believe their facility is not <br />subject to ELD. [Cal. Code Regs., Title 23, § 2640, subd. (e)(2)] (See below for <br />additional information on requests for reconsideration.) <br />Owner/Operator Responsibility: Owners/operators of UST systems that meet the <br />criteria for ELD must complete the following steps: <br />• ELD Proaram Plan Approval: Have a written program of ELD (testing program <br />plan) reviewed and approved by the local agency within six (6) months following <br />notification by the SWRCB UST Program. [Cal. Code Regs., Title 23, § 2644.1, <br />subd. (a)(3)] <br />• ELD Test Implementation: Implement the approved program of ELD (testing <br />program plan) at their facility. <br />• For UST systems with a single -walled component, ELD testing <br />must be performed within 18 months following receipt of notification <br />from the SWRCB UST Program and repeated every 36 months. <br />[Cal. Code Regs. Title 23, § 2644.1, subd. (a)(3)] <br />• For UST systems without a single -walled component, upon written <br />request by the SWRCB, one ELD test must be performed within 18 <br />months from the date of notification. [See Health & Saf. Code, § <br />25289(b).] <br />• ELD Test Notification: Notify the local agency at least 48 hours prior to <br />conducting the ELD test unless this notification requirement is waived by the <br />local agency. [Id., § 2644.1,subd. (a)(4)] <br />• ELD Test Result Submittal: Submit the results of the ELD test to the SW RCB <br />USTProgram and the local agency within 60 days after the test has been <br />performed. [Id., § 2644.1, subd. (a)(5)] <br />3 A hybrid UST system refers to a UST system comprised of both single -walled and double -walled components. Because they <br />contain a single -walled component, hybrid UST systems that are subject to ELD must be tested within 18 months of notification and <br />every three years thereafter, unless all regulated single -walled components are upgraded to double -walled. [Cal. Code Regs., Title <br />23, § 2644.1, subd. (a)(1)) <br />California Environmental Protection Agency <br />ped Recycied Payer <br />
The URL can be used to link to this page
Your browser does not support the video tag.