Laserfiche WebLink
D. Results of Testing/Servicing* <br />Software Version Installed: 3. D2 <br />Complete the following checklist: <br />Yes ❑ No* Is the audible alarm operational? <br />Yes ❑ No* Is the visual alarm operational? <br />Yes Q No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Yes Q No* Were all sensors installed at lowest paint of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />Cl Yes I] No* If alarms are relayed to a remote monitoring-station, is all communications equipment (e.g. modem) <br />;2rN/A operational? <br />Yes 0 No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ NIA monitoring system, detects a leak, fails to operate, or is electrically disco cted? If yes: which sensors initiate <br />positive shut-down? (Check all that apply) J�ump/Trench Sensors; Dispenser G tainrnent Sensors. <br />Did you confirm positive shut-down due to leaks and sensor failure/disconnection? 0Yes, ❑ No. <br />O Yrs Q Ifo* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e, no <br />�(d''N/A mechanical overfill prevention, valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />d Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check al! that apply) <br />Ll Product; LJWater. If yes, describe causes, in Section E, below. <br />es ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section 1E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />