Laserfiche WebLink
• STATE OF CALIFORNIA • <br /> STATE WATER RESOURCES CONTROL BOARD = 'cso...... <br /> ,c�; <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. 1 <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ' ,SE <br /> ONE REM 2 INTERIM PERMIT S CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED O <br /> ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ a' <br /> 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: W, I t T <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS_ SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.a ':�)ZdZ— <br /> B. MANUFACTURED BY:C <br /> C. DATE INSTALLED(MC/DAY/YEAR) <br /> V I D. TANK CAPACITY IN GALLONS: O 00 <br /> II.TANK CONTENTS IFA-1 IS MARKED.COMPLETE ITEM C. <br /> A ��1 MOTOR VEHICLE FUEL ❑ d OIL B, C. is REGULAR UNL&D® ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ SO EMPTY ��, 1 PRODUCT ❑ ib PREMNM UNLEADED ❑ 0 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ IC MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M65 <br /> ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE INTEND.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br /> C.ASM: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF �I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER <br /> ❑ ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL d SINGLE WALL IN A VAULT <br /> ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL � 3 FIBERGLASS ❑ d STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br /> (Primary Tank) O ❑ ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ I RUBBER UNED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 0 PHENOLIC LINING <br /> LINING OR 5 GLASS LINING ❑ 6 UNUNED ❑ 95 UNKNOWN <br /> COATING ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YESk_ NO_ <br /> D.EXTERIOR ❑ I POLYETHYLENE WRAP2 COATING <br /> CORROSION ❑ ❑ 3 VINYL WRAP d FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTON ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,etc SPILL CONTAINMENT INSTALLED(YEAq) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE VES <br /> NO <br /> _ _ STRIKER PLATE YES NO_ DISPENSER CONTAINMENT YES No <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION 2 PRESSURE A U 3 GRAVITY <br /> A U d FLEXIBLE PIPING A U 89 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN <br /> A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)U d FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W1 COATING <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 8 100% METHANOL COMPATIBLE W/FRP <br /> D. LEAK DETECTIONllk1ECXMp�uxE LFAIc ❑2 urE Nnn9KEss ❑3 A U 99 OTHER <br /> oETEcroR 1Esnxa ^15 I"r�s1m� ❑1 Occmaxc uxE s Aurawnc ww <br /> V.TANK LEAK DETECTION 9E E" �Hu wxn ❑99 OTHER <br /> ❑ 1 VISUAL CHECK ❑ 2 RECOOAL CILIATIONINVENTORY <br /> ❑ 3 MONAORING d AUTOMATIC <br /> C TANK ❑5 GROUND WATER 6 ANNUAL TANK <br /> 7 CONTINUOUS INTERSTITIAL MONITORING ❑ TESTING <br /> MONITORING ❑ 8 SIR ❑ 9 WEEKLY MANUAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> TANK GAU IN TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE <br /> 1/A 1/E$ ATED DATE LAS�LISED(MOIDAY/YR) .ESTIMATED QUANTITY OF <br /> !Y /i SUBSTANCE REMAINI 3.WAS TAN LLED WITH YE� NO <br /> GALLONS MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDE N TY OF PE U Y,A T <br /> TANK OWNERS NAME BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> (PRINIEDL 51(iNATUR ^e< FLgi DATE <br /> C orl 0 $ <br /> LOCAL AGENCY USE ONLY THE STATE .NUMBER I MPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTYN J SDICTION M FACILITY603 TANK N 6 <br /> STATE I.D.# m a s ( � p <br /> PERMIT NUMBER <br /> PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICAON- <br /> SHOULD BE ACCOMPANIED BY A PLOT P A� FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C BE COMPLETED FOO INSTALLATI S. THIS FORM <br /> LE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE, GROUND STORAGE TANK REGULATIONS <br /> FORMS (695) <br />