My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
2300 - Underground Storage Tank Program
>
PR0231341
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2021 11:07:38 AM
Creation date
11/5/2018 3:46:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231341
PE
2361
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\501\PR0231341\INSTALL PLAN 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC riEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br />445 N. San Joaquin Street • P.O. Box 388 • Stockton, CA 95201-0388 <br />(209)468-3420 <br />TO: INST AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br />San Joaquin County Public Health Services -Environmental Health Division (PHS-EHD) has established the <br />following guidelines to assist you in the completion of your construction project. The guidelines specify the <br />construction and monitoring criteria necessary to complete our review of your proposed underground storage <br />tank (UST) system. <br />1. SUBMITTAL OF PLANS <br />a. Submit 3 complete sets of detailed drawings in non -erasable print to the Environmental <br />Health Division. Upon approval, one set will be retained by the department and the other <br />two will be returned. <br />b. Include equipment and material specification sheets and manufacturer's brochures describing <br />operating and monitoring systems and listing numbers or other evidence of a nationally <br />recognized testing organization approval. <br />C. Include detailed monitoring and response plans for facility. <br />d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br />structures, including existing UST(s). <br />e The plans should include a cross sectional diagram of the tank and piping system including <br />secondary containment, overflow protection equipment, and extension of all pipes and/or <br />ports from subgrade to finish grade. <br />2. PLAN REVIEW AND OPERATING PERMIT FEES <br />a. New facility plan review fee of 5624.00 (8 hoc: minimum per facility), 5170.00 fee per tank, <br />plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br />b. New installation of additional tank at an existing facility is 5624.00 plan review fee (8 hour <br />minimum per facility) plus $170.00 fee per new tank, and 556.00 per tank state surcharge fee. <br />c- It should be noted that a S624.00 plan review check fee required for each submittal allows <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed to the <br />applicant at a rate of 578.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS/EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br />deficiencies. <br />f. To expedite the review of installation pians, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date. <br />.... i_ .......... -.1. II...JiL 1'.... ..... 6.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.