Laserfiche WebLink
SYSTEM. PRINTSET INFORMATION <br />x Four complete sets of plan (To include specification sheets and/or equipment brochures if not on file). <br />.L Plana drawn to sole in non -erasable print. <br />Plot plan to show location and number of tanks. <br />Tank cross-sectional diagram included on prints submitted. <br />Detail of tank, piping system, excavation and cover. <br />i� Tank(s) and piping approved by a nationally recognized independent testing organization. Mtle 23, S13rhapter 16, <br />Article 3, Sec. 2631 (r) L 26351 <br />Verification of product compatibilfty with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. (Section 2635 (b) (5)] <br />Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br />[Section 2635 (b) (6) t (7)] <br />Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)7 <br />NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br />be submitted directly to PHS/EHO from the testing company or owner of facility. [Health L Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (g)] <br />IK # <br /># 1 <br /># Z <br /># <br /># <br /># <br />'ACITY <br />IUFACTURER <br />(POSITION <br />Ta"t. <br />L <br />'EL <br />(DUCT <br />�� <br />Z <br />:ROSION PROTECTION <br />�( C '- <br />— <br />�- <br />.. LISTED <br />C <br />C <br />C _ <br />IPATIB)LITY WITH 100% <br />HANDL <br />_ <br />y 5 <br />L <br />TANK(s) TO BE IMSTALLFTI <br />_ A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting'tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimerLsions and materials. <br />(2) Striker plate under all accessible openings. <br />(3) installation instructions require an air test and soap bubble test prior to installation. <br />D. Non-ciad steel tank [Section 2635 (b)] <br />(1) cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Approved by a corrosion engineer or N.A.C.E. technician. <br />(3) Document stating inspection method and frequency (minimum semi-annuai inspection requirement). <br />4 <br />