Laserfiche WebLink
13. Handling of excavated soil: <br /> a) What material will be used to line and cover stockpile placed on the ground?N/R <br /> b) Number of soil s mples (# samples/cubic yard) to be collected and analyzed from stock ile? <br /> 2 SArhP�ES SO L�v�/L MA, S �T T7E DkSI',�"£�ln U r. 7�E" 51727 <br /> 5 <br /> c) What will be the disposition of stockpile after analysis? <br /> Z7dt MLS OF OLS✓tr/ZQtCS 111.4 LWIAJ6 FXCAVA `. T7LrU r�LL � L <br /> W/14 OC BAL'KFi1111A1EDM dY 10ci2T A266 <br /> 14. What is the depth to groundwater? 4o , >� ��6 'r1&0g0 4.62W 'jY7d�p <br /> Describe the source of information: <br /> /IYEA�LIPL�I�itt/ DF AOMP-8Y N/EI.LS <br /> h. Are there any wells on this parcel or adjacent properties? YES kCj NO [ ] <br /> TYPE OF WELLS DISTANCE TO TANKS(S) <br /> Public Well ft. <br /> Private Well 1/��O ft. <br /> Irrigation Well ft. <br /> Monitoring Well ft. <br /> Other ft. <br /> 16. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br /> responsible party submitted a "Letter of Commitment" to PHS/EHD? <br /> Page 6 <br /> closplan (Rev 3/19/91) wp <br />