Laserfiche WebLink
JUNCTION BOX 7 <br /> vi <br /> PLLD LINE 8 <br /> LEAK MONITOR <br /> a�...A�®Qc � ® ,g .�� TURBINE 1p DISPENSER <br /> . .4 MONITORING CONDUIT 1 I °� <br /> JUNCTION SUMP LEADER TO NEXT SUMP �`� <br /> W . <br /> BOX f4 CABLE �'� I `� E <br /> le—POWER CONDUIT 4" DIA. FRP RISER -- JUNCTION BOX 22 �x <br /> 1FOR TURBINE SPLICE 1 FT® FROM <br /> W <br /> MONITORING BOTTOM OF RISER PIPE - JUNCTION BOX 25 <br /> CONDUIT <br /> SENSOR SWITCH SEA2OL OFF <br /> 4 _. MUST REACH "'. .� I '�. <br /> BOTTOM OF TANK <br /> SEAL–OFF SENSOR CABLE `� '� <br /> (REQUIRED ONLY AT SEAL--OFNe <br /> 2 <br /> FIRST SUMP FROM PANEL) SENSOR <br /> 10 DISPENSER P FRAME ® � RUN CONDUITS THROUGH <br /> { SLOT IN DISPENSER FRAME. <br /> ri <br /> SUMP LIQUID MONITORING SENSOR •� �" �. <br /> (BELOW APEX OF TANK AT LOWEST 6 <br /> SENSOR MOUNTING ING <br /> t <br /> POINT) FIBERGLASS TANK— <br /> SEE INSET VIEW OF SENSOR SWITCH <br /> AT BOTTOM OF TANK <br /> Su Section Sing_ Installation � . e <br /> 21 DISPENSER J--BOX <br /> SCALE- /�� Pam NOT TO SCALE: - MONITORING CONDUIT <br /> INTERCOM CONDUIT <br /> DISPENSER POWER & DATA COPDM <br /> 11 OVERFILL ALARM <br /> ALARM ACKNOWLEDGE STEEL 12_ 2TE SUMP MONITOR <br /> SWITCH PAINT TO MATCH LIQUID SENSOR _ <br /> 6" 0 BOLLARD_ SITE CONDITIONS oft <br /> FILL W/ CONC® i" <br /> (TY . 2) <br /> .rECT TO NEXT DISPENSERCL <br /> i `� r <br /> 2" LIQUID <br /> GHT FLEX Dispenser Confainment Sump <br /> ESO >� <br /> WP ENOL. 7 O JUNCTION BO <br /> NOT TO SCALE- <br /> RCEPT. 1 l" RGS <br /> CONDUIT <br /> 0 <br /> 4"x4" STEEL POST SEAL--OFF 52 <br /> PAINT TO MATCH <br /> SITE CONDITIONS <br /> FINISHED <br /> GRADE A <br /> 11-0 <br /> 00 <br /> TrI <br /> o� 1 '.4 �. ,°� ► �. 44.E <br /> 18"0 CO�CRPTE <br /> P, FOOTING <br /> BY G.0 <br /> 1" RGS PVC COATED CONDUIT <br /> • <br /> Sump Section Duai Turbine Overfill Alarm & Acknowledgment <br /> Ich <br /> SCALE® 3/4" V--O" NOT TO SCALE: <br /> 4 �. <br /> ® 4 �4� <br /> e <br /> JUNCTION 7 1 TANK GAUGE CAP <br /> BOX & ADAPTER <br /> (CONTRACTOR TO <br /> M INSTALL CLEVIS <br /> AND COTTER PIN <br /> 1 MONITORING SUMP <br /> E2–:)CONDUIT <br /> g TANK LEVEL <br /> A 4 I GAUGING <br /> '_i <br /> cons ltant ob <br /> l <br /> master release that <br /> BP WEST COAST PRODUCTS" LLC MASTER REVISIONS <br /> project master <br /> LIQUID D MONITOR <br /> I OR 6 1/21/02 RGF <br /> Q xe date drawn y <br /> (BELOW APEX OF TANK AT NO. DATE REVISIONS BY PROJECT RELEASE <br /> LOWEST POINT IN THE SUMP) <br /> 1 6 2 DISPENSER CONTAINMENT SL11�P �C ATG CAP � CV Fllr�arri <br /> PERMIT <br /> Facility/Project <br /> BID <br /> { rion _ _ ,_ _.� __,__ CONST. he t nar: i <br /> �'4 ' ' ' <br /> E2 - 3 <br /> SCALE: 3/4•" - 1'_CJ"" �_ _ �� <br /> AS-�Bllltw <br />