UNDER DISPENSER VAPOR
<br /> H C CONTAINMENT SUMP 34 UNLEADED REGULAR RECOVERY "B" SIDE OF 1 _1 " VAPOR RECOVERY
<br /> UNDER DlSPEN R "A" SIDE F __ REGULAR STABILIZER BAR PREMIUM UNLEADED 31 IMP CT VALVE SHEAR SECTION
<br /> 34 CONTAINMENT UMP DISPENSER TK3-�3 TK3-- UNLEADED ASSEMBLY 1�-1/2" x 1" DISPENSER MUST BE FLUSH
<br /> STABILIZER B REDUCER BUSHING W/ TOP OF PUMP ISLAND)
<br /> ASSEMBLY RECOVERY _ TCP OF CONCRETE DRIVE SLAB ��
<br /> .- -• --- --- --�-- -�- _ --»- �---- DISPENSER ISLAND
<br /> UNLEADE 0 0 0 0 0 � DIS EN 3
<br /> PREMIUM - �— .. �� _ ® — w °• .
<br /> . HOLES FOR CONDUITS F�
<br /> 4
<br /> `� '
<br /> 0 1 1/2" STAGE 11 VAPOR
<br /> !� 31 RECOVERY EMERGENCY
<br /> 0 0�3
<br /> �- SHEAR IMPACT VALVE
<br /> 2
<br /> 0 Ln
<br /> 1-1/2' FLEX CONNECTOR BULKHEAD FITTING 36 «1, W
<br /> :4 :1
<br /> -� (TYP. 3 PLCS.)
<br /> Q c� I I 101 0 I I»»_ 0 c� c 1.,_1/2 x3 NIPP
<br /> 1 P ✓ I ^aq � P I " SAND OR PEAGRAVEL-- 1.--1/2" COUPLING
<br /> W 1�-1/2 FLEX BACKFILL
<br /> P I D32CON ECTOR
<br /> P P I 1 (TYP. PLCS.) »� " "
<br /> Lar ) cq_ ,� 2 1 1/2 x24
<br /> FLEX CONN.
<br /> A a
<br /> TK3-3 I
<br /> TK3»-3 _ _ _» __ »_ e� _ :® __. _
<br /> °� P®4S
<br /> FIBERGLASS2" DELL x MALE
<br /> P P
<br /> 2" DELL x MALE "B" SIDE OF 3O 1 1/2" PRODUCT EMER. °
<br /> EDGE OF TRENCH - (INSIDE SUMP) I DISPENSER SHEAR IMPACT VALVE °
<br /> I DOUBLE POPPETED �� \ °` ° 34 UNDER DISPENSER
<br /> _
<br /> (TYP. 2 PLCS.) ` CONTAINMENT SUMP
<br /> _- -- �--- ---R " FIBERGLASS TEE W �
<br /> ff 21 cit \ NATIVE SOIL 2" REDUCING BUSHING
<br /> f!
<br /> Q 0 3 FIBERGLASS STAGE It
<br /> VAPOR RECOVERY PIPE
<br /> VAPOR RECOVERY _ ° ° _ 37 3" PENETRATION ,�" 'T"
<br /> NOTE: SEE TK4-3 FOR I
<br /> 0 ® MATERIAL LIST
<br /> PRODUCTa UNDER DISPENSER 34 36 2" PENETRATION
<br /> CON1pAIMENT SUMP Vapor Recovery Piping at Dispenser
<br /> I 2" FIBERGLASS 43* ELL. (TYP.) THIS IS VIEW FROM FF FF SIDE F DISPENSER
<br /> PRODUCT
<br /> ° NOTES: NOT TO SCALE:
<br /> 1. VAPOR LINES TO SLOPE FROM DISPENSERS TO TANKS 1/6"
<br /> -- PER FOOT MIN.
<br /> 2. THE VAPOR RECOVERY SHEAR VALVE SHALL BE A TOP ENTRY VALVE.
<br /> I SEE SECTION B ON THIS SHEET
<br /> 3. ALL SHEAR VALVES SHALL BE SECURELY MOUNTED TO THE STABILIZER 1--1 2" IMPACT VALVE W/ UNION TOP 3
<br /> BAR ASSEMBLY TO ASSURE VALVES WILL TRIP AND OR SHEAR UPON AN SH R SECTION MUST BE FLUSH
<br /> IMPACT ON THE DISPENSER OF DESIGN CONDITIONS. / TOP OF PUMP ISLAND)
<br /> EDGE OF TRENCH 4. ALL UNDER DISPENSER CONTAINMENT SUMPS AND FITTINGS ARE PLUMBED BY FEB" SIDE F DISPENSER ISLAND 3
<br /> 20 2" FIBERGLASS PRIMARY PIPE (TYP.) THE CONTRACTOR. TOP OF CONCRETE DRIVE--SLAB — DISPENSER
<br /> 20 3" FIBERGLASS SECONDARY PIPE (TYP.) 6. THE LOCATION OF THE PRODUCT AND VAPOR RECOVERY PIPING STUB-UPS SHALL
<br /> B C BE AS SHOWN CONTRACTOR IS RESPONSIBLE FOR CORRECT ORIENTATION OF THE
<br /> STUB UPS TO THE DISPENSER. ANY ADJUSTMENTS OF THE INTERNAL WORKINGS OF THE
<br /> TK3-3 TK3-3 DISPENSER TO ACCOMMODATE INCORRECTLY INSTALLED PIPING WILL BE AT CONTRACTORS a
<br /> 3" FIBERGLASS TEE AND OWN EXPENSE. SEE SECTION "A" ON DWG. TK3-4 FOR DISPENSER BASE DIMENSIONS.
<br /> 3f' FIBERGLASS 45' ELL. (TYP®) � _� _m
<br /> (SECONDARY) . IT IS THE RESPONSIBILITY OF THE INSALLING CONTRACTOR TO TRIM THE UNDER DISPENSER a.
<br /> CONTAINMENT SUMPS AS REQUIRED TO MEET THE DESIGN REQUIREMENTS OF PRODUCT & VAPOR 4 '4 .4
<br /> Plan View Detail
<br /> ( Blending )
<br /> PIPING SLOPE TO TANKS IN CONNECTION WITH SITE SPECIFIC GRADING CONDITIONS.
<br /> SAND OR PEAGRAVEL-
<br /> Section Shear Valve Section
<br /> ® o
<br /> Three Product MPD v-� iping 1, '1" N" +1
<br /> BACKFILL.
<br /> 10 CLAMP LPTYIf
<br /> NOT TO SCALE: NOT TO SCALE: 1�-1/2"x3" NIPPL
<br /> BULKHEAD FITTING 3?
<br /> �_._ .�•.�, �.. -1-1/2- COUPLING
<br /> DISPENSER AUXILIARY _ � ���•'��
<br /> _ 32 1-1/2"x24"
<br /> JUNCTION BOX (INTERCOM) FLEX CONN.
<br /> "A" SIDS,. F I � _ �
<br /> "BFF SIDE F" DISPENSER r'_. _ m »» 2" BELL x MALL
<br /> °
<br /> DISPENSER DISPENSER
<br /> P...a ...............a
<br /> JUNCT`!ON BOX C0 P P
<br /> ,. . s`: 34 UNDER DISPENSER02
<br /> ° '° 11 3"x2" TEST RE UCER CONTAINMENT SUMP
<br /> b MULTI-PRODUCT 1
<br /> es°° °, .p•. DISPENSER
<br /> a i NATIVE SOIL-
<br /> 1�-1 2" IMPACT VALVE W/ UNION TOP
<br /> ((SHEAR SECTION MUST BE FLUSH EAL OF
<br /> W/ TOP OF PUMP ISLAND) TYPICAL . fid' NOTE: SEE TK43 FOR
<br /> SPLASH GUARD MATERIAL LIST �
<br /> GASOLINE RESISTANTSEALANT
<br /> AROUND BASE OF DISPENSER 6" RAISED DISPENSER ISLAND
<br /> Product Piping at Dispenser #V)
<br /> SEE DETAIL 16 O TK3-4EL
<br /> 39
<br /> � • . �•' d • . � • ' • � . � • • � � NOT TO SCALE: bi
<br /> w
<br /> TOP OF CONCRETE DRIVE SLAB
<br /> ®COMPACTED SAND OR
<br /> �' 4 4 p �. a ` �. PEAGRAVEL BACKFILL
<br /> 4 ,1 \ 6" BASE OR SURFACE
<br /> . 4 . MATERIAL" WHERE
<br /> REQ'D. BY OWNERS TOP OF FINISHED SURFACE
<br /> ENGINEER
<br /> a ,
<br /> ' /2"x NIPPLE
<br /> d °f
<br /> 11/2"x24" FLEX CONN. 32 ---SENSOR MOUNTING 1-1/2" COUPLING
<br /> HANGER KIT (TYP.)
<br /> 20 2" PRIMARY CLAPS E Tl ° SEE ELECTRICAL
<br /> ......,. 8 ..i'
<br /> CONTAINMENT PIPE
<br /> " 37 BULKHEAD FITTING
<br /> DRAWINGS FOR VAPOR RECOVERY LINE
<br /> 3 SECONDARY- Q ELECTRICAL INFORMATION
<br /> 20 CONTAINMENT PIPE AND INSTALLATION 12ff .off 1- 7"+ 2 PRODUCT PIPING LINES
<br /> / R TYP.
<br /> _.................°,...,.,................,. .........,
<br /> NOTE: CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT HOLE AND
<br /> rj—Txi W,^Tpa..e..................................wm..^.^'....p.^...... ..•..•'.eP................... TRENCHES FROM SURFACE WATER RUNOFF UNTIL PAVING 1S REPLACED.
<br /> _.•............>......................................•.................. .....,°......,.....,,,,,.'
<br /> Typicai Piping in Trench
<br /> ,.„.....,,_,,. . O ......,.,..
<br /> ff FA1 .°............... ........«...°.,...,....,..,,......,.,................,, ...°.......,...... � CIldItr7P"it 'C>L�
<br /> 11 3x2 'TEST REDUCER ----* 2” R......................°°..,.,.,........,...............°.,.,...............°,...,..,... ..a.,.....,,....,. --�
<br /> BELL x MALE �
<br /> __T
<br /> (PRIMARY PIPING) � •- DISPENSER MONITORING
<br /> NOT TO SCALE: master release 2dat
<br /> SENSOR. �»..
<br /> NO. BP WEST COAST PRODUCTS, LLC MASTER REVISIONS exe da drawn
<br /> master
<br /> __ __ _ _ �» _ ___, �X dot drea�!n kaY
<br /> NOTE: SEE TK4-3 FOR 4 UNDER DISPENSER CONTAINMENT NO. DATE REVISIONS BY PROJECT RELEASE OV
<br /> MATERIAL LIST 34 SUMP. SIZE TO MATCH _ '� ®� _ Filename
<br /> VAPOR RECOVERY NOT SHOWN THIS VIEW DISPENSER FOOTPRINT. I I I L I TiI 1 9/4/02 N � ENVIRON SUMP, OMIT CONDUIT PENETRATIONS OV PERMIT FACX XXX TK3-
<br /> THIS DOCUMENT AND THE INFORMATION HEREIN RELATING TO FRED FIEDLER Master Standard
<br /> NOTE: NOTE: AND ASSOCIATES AND ITS CLIENT BEEN FURNISHED IN CONFIDENCE FOR —-- — -- ��
<br /> UNDER DISPENSER CONTAINMENT SHALL BE EQUIPPED WITH A POSITIVE SHUTDOWN ALL FITTINGS IN UNDER DISPENSER CONTAINMENT SUMP THE PRIVATE USE OF AUTHORIZED PERSONNEL. NO PART HEREOF SHALL BE BID
<br /> COPELECTRONIC SENSOR THAT WILL INTERRUPT POWER TO THE TURBINE ARE INSTALLED BY THE CONTRACTOR, ELECTRICAL OTHERS OR
<br /> DUPLICATED, DISTRIBUTED, DISCLOSED EX MADE AVAILABLE TO ___ �—� �-_ � -
<br /> OTHERS OR USED TO ANY EXTENT WHATSOEVER EXCEPT AS EXPRESSLY
<br /> Uontairiffient Sump SHALL ENTER FROM THE SIDE OF THE DISPENSER. AUTHORIZED IN WRITING BY FRED FIEDLER AND ASSOCIATES AND ITS CLIENT. .___� ShOOt_ name
<br /> PRODUCT AND VAPOR RECOVERY PENETRATIONS ARE ANY PERSON, FIRM OR CORPORATION RECEIVING THIS DOCUMENT, HOWEVER CONST.
<br /> OBTAINED, SHALL BY VIRTUE HEREOF BE DEEMED TO HAVE AGREED TO THE LOCATED ON THE "B" SIDE OF THE DISPENS9, —»--
<br /> FOREGOING RESTRICTIONS.
<br /> NOT TO SCALE: �* - _ - --- �--- AS--BUILT TK3 - 3
<br />
|