1 ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. Anvv
<br /> bP WEST COAST PRODUCTS,LJLC
<br /> 2,
<br /> 77
<br /> "THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD
<br /> FINISHES IN PLACE, _TUITNFEM—ANA—GE"C,--T(iE—NT—FOF'-6'P7—'—'-
<br /> 3, SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE. ONLY, NOT' GRAPHICALLY, ALL EXISTING
<br /> PIP E. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL
<br /> PRODUCT PIPING IS DOUBLE CON',AINMENT
<br /> PIPE.
<br /> -ALLA-FION NOTES
<br /> HEALY EVR PHASE 11 AND ISD UPGRADE INS1
<br /> X EXISTING (4) 10,000 GAILON DOUBLE WALL -TANKS AND PIPING SYSTEMS TO REMAIN. THERE SHALL BE NO WORK
<br /> PERFORMED ON ANY BURIED PIPING AS A PART OF THIS SCOPE.
<br /> NOT USED
<br /> _��A _6NAL SITE T6AFrF0
<br /> N9_L�
<br /> EXIST
<br /> -ING (4) WAYNE 3V580 MULTIPRODUCT DISPENSERS TO REMAIN, CON-TRACTOR 1-0 REMOVE ALL. EXISTING DISPENSER LTTNf�.
<br /> HANGING HARDWARE & ASSOCIATED EQUIPMENT IN ORDER 'TO INSTALL, NEW EVR PHASE 11 EQUIPMENT PER CARES
<br /> TIVE ORDER VIR202
<br /> EXECU
<br /> CONTRACTOR TO INSTAL.[- NEW HEALY DISPENSER MOUNTED RETROFIT KIT WITH VIDJOOOP VACUUM PUMP.
<br /> CONTRACTOR TO INSTALL NEW HEALY VAC ASSIST HOSES, SWIVELS, NOZZLES, & BREAK---AWAY VALVES,
<br /> T LL DISPENSERS,
<br /> -TRACTOR 1-0 INSTALL NEW VEECER ROC? ISD FLOW METERS AT A
<br /> * CON
<br /> 4z� -
<br /> -TRACTOR TO PULL NEW MONITORING SENSOR CABLING THROUGH EXISTING CONDUIT
<br /> F_
<br /> * CON
<br /> CONTRACTOR TO RE--CONNECT ALL EXISTING ELECTIRICAL CONDUITS AS RE UIRED.
<br /> 98 REMOVE AND REPLACE 0
<br /> CONTRACTOR TO INSTALL. (1) NEW VEEDER ROOT SID PRESSURE SENSOR AT DISPENSE
<br /> EXISTING MONITORING R NEAREST THE -TANKS,
<br /> Q 4D
<br /> CONSOLE 61
<br /> V
<br /> <1
<br /> CONTRACTOR INSTALL NEW VERTICAL CLEAN AIR SEPARATOR UNIT ON 4'--O"X4-'---O"X8" MINIMUM EN \N4
<br /> <
<br /> EXISTING TANK 'THICK CONCRETE PAD.
<br /> OVERFILL ALARM IAND PINNING AND DESIGN SPECIALISTS"
<br /> (jD CONTRACTOR TO MANIFOLD ALL EXISTING ,ASOLINE VENT RISERS & CONNECT 1" VENT LINE FROM HEALY TANK TO VENT 18215 72ND AVENUE SOU H
<br /> STACK MANIFOLD PER DETAILS, SLOPE 1/8" PER FOOT FROM NEW HEALY CLEAN AIR SEPARATOR. CONTRACTOR TO KENT, WASHINGTON 98032
<br /> AM/PM BUILDING —6222
<br /> (425) 251
<br /> -Y THAT EXISTING 'TANK VENTS ARE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING
<br /> VERT
<br /> OPENING OR PROPER]-Y LINE 11-1AT CAN BE BUILT UPON. INSTALL HEALY CLEAN AIR SEPARATOR TANK AND ASSOCIATED
<br /> _VR PHASE 11 STANDARDS AND E.O. VR---202, INSTALLATION SHALL BE PER CARES
<br /> ...... PIPING AND F1 TTINGS PER NEW GARB E
<br /> E.0 AND MANUFACTURERS INSTRUCTIONS. SEE DRAWING TK2 -I FOR DETAILS.
<br /> A NO. DATE REMSION DESCRIPTION
<br /> NEW SUMP
<br /> 7/9/08 CONSIRUC110N RELEASE
<br /> TE: INSTALLATION SHALL MEET THE STATE APPROVED INSTALLATION INSTRUCTIONS FOR THE HEALY
<br /> SENSOR NO
<br /> (E) VENT RISERSr, 6 SYSTEMS INCORPORATED CLEAN AIR SEPARATOR AND THE STATE APPROVED IN--STATE DIAGNOSTICS
<br /> INSTALLATION INSTRUCTIONS. A2 10/1/08 CONSTRIJUON FIELD CHANGE
<br /> 1" VENT TIE--IN OVERHEAD
<br /> 4
<br /> EXISTING E.S.O. CONTRACTOR 1-0 INSTALL NEW CONCRETE FILLED BOLLARDS IN LOCATIONS SHOWN.
<br /> 91
<br /> INSTALL NEW HEALY CLEAN AIR SEE
<br /> SEPARATOR -TANK ON 4'x4'x8" 5
<br /> 'TOR TO REMOVE EXISTING VEEDER [ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT (TLS--3501R)
<br /> CONTRACTOR _ Ai
<br /> TK2--i
<br /> CONCRETE PAD THE EXISTING LOCATION, RE--LAND SENSOR WIRING IN NEW PANEL PER DETAILS & PROGRAM TO
<br /> PANEL Al PANEL
<br /> LAR
<br /> SIPHON MONITOR TANK SUMPS, DISPENSER SUMPS, 'TANK EVEL PROVE, ISD FLOW METER, PRESSURE SENSOR & TANK ANN
<br /> U
<br /> SPACES.
<br /> . .........
<br /> VEEDER ROOT PANEL TO BE PROGRAMMED BY A CERTIFIED TECHNICIAN UPON COMPLETION OF UPGRADE AND PRIOR TO
<br /> PLACING EQUIPMENT BACK IN SERVICE.
<br /> /LO\
<br /> CONTRACTOR TO REWIRE SUCH THAT THE
<br /> PRIMARY (JE) WHERE EXISTING TURBINES SERVE IN A MASTER AND SLAVE CONFIGURATION, CONI 17
<br /> ..........
<br /> N=1 IVEEDER ROOT AUTOMATIC TANK GAUGE DETERMINES WHICH TURBINE IS STARTED AS THE MASTER BASED ON THE LEVEL ----------
<br /> INSTALL NEW BOLLARD
<br /> ANKS, SEE DRAWIN(�; TK3--2 FOR DETAILS
<br /> OF PRODUCT IN THE I A
<br /> (TYP� 2 PLCS.) 87
<br /> SEAU
<br /> r 4-:
<br /> T CONTRACTOR TO PERFORM ALL REQUIREB VAPOR [RECOVERY IESTING PER CARB E.0, VR--202 AND LOCAL AIR POLLUTION
<br /> CONTROL AUTHORITY AND FORWARD RESIU,_TS TO OWNER AND TO JURISDICTION AS SPECIFIED IN THE PERMIT
<br /> NEW ISD PRESSURE CONDITIONS. HA G1
<br /> 'E
<br /> SECONDARY
<br /> 1 RUB /
<br /> SENSOR
<br /> 87 TING WAYNE 3V/580 SINGLE HOSE C�2 NO NEW ELECTRICAL LOADS ARE BEING INTRODUCED AS A RESULT OF THIS PROJECT. CONTRACTOR 'TO ENSURE THAT §781,4
<br /> EXIS
<br /> .-FIT WORK PERFORMED ON THE EXISTING DISPENSERS SHALL BE IN CONFORMANCE AND MEETS "THE
<br /> PER SIDE BLENDING 3 PRODUCT ALL NEW RETRO
<br /> 16,11
<br /> -ION 514 AS SPECIFIED IN THE PERMIT' CONDITIONS.
<br /> 45
<br /> REQUIREMENTS OF CEC 2004 SECT
<br /> MPD'S TO REMAIN. CONVERT
<br /> TEM
<br /> DISPENSERS VAPOR RECOVERY SYS 6/30/(
<br /> TO HEALY EVR PHASE 11 WITH ISD
<br /> v Ii
<br /> e
<br /> 4) 0
<br /> (TYP. OF TRACTOR TO FIELD VERIFY THE INSTALLATION OF (1) FIRE EXTINGUISHER MINIMUM RAI-ED 2-1 20BC WITHIN
<br /> CON A N
<br /> (13D c A,�_
<br /> -HE TANKS.
<br /> -ION OF 75' TO 20' OF I
<br /> LOCAI
<br /> T
<br /> !�E �EGIDENT OF -P-SE MAO�RALS J".)rRS'AND�., 1),A'
<br /> -ERIA'S IS CAN�ID Fil'3P, A',D ALSO,
<br /> 7 SUMP SENSOR AT EXISTING 87 SIPHON TANK (#,5) FILL SUMP, C,)PY�r,[-I- IN 11 E VA
<br /> ..........
<br /> ___"v -11 ",\/ -v`___--v- IV-- 'v",
<br /> 12�- 1
<br /> _7
<br /> I-LHH\f EW
<br /> 14D CONTRACTOR TO REPLACE VEEDERROO TIIAI -)IF 'AA'I-RIAI-S CON'A,N PRIVIIEOFD AND CO',F:1FN`A_
<br /> DiSINESS NFORYA70N �',',F BI ACCDRD:N�X_Y, "I[
<br /> VEEDER--ROOT SENSOR MODEL #794380-323. F1wNT 4CRUS O N�YAIN IIL.,E VAIES,ALS
<br /> CONF15FNCE Al�') AORFES 1,01 'C DISCLOOE V,FH
<br /> To I J-�`,VIR AREES
<br /> YA-EISALS A',Y O-HER PARTY AND
<br /> NO] -111) VAKE 3PIi S Of: 'FIE VA I OR A
<br /> T-_ - "PIPC
<br /> -0 '�R -ED
<br /> AGREES THE VATf A,s ME LIMI
<br /> __3 p "A F -ERIA1 S
<br /> PUR13-E FGR W-11�,I , 5 MAD, VA
<br /> A\,A-Al AND REI,�IPIENI AGREES LE{ 'N ALL
<br /> EKE
<br /> -0 PP D-I- ")F T-
<br /> V A fl��ALS' IER J p ON CCVP�Elf)N
<br /> 'ENDED UF':q REGI.IE51 01 B0,
<br /> COMPLIANCE NOTES
<br /> x
<br /> TARTING ANY WORK.
<br /> 'ONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE S SP )OE1_ 1,01 AND �,ARRANI I-HAT -M PI,ANS FOR
<br /> 1 ALL DIMENSIONS AND C D DISPEN'
<br /> S:DRAGE A'� ,IN:; ARE �uvil[
<br /> ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE A! -EGAL REDJRLWNS j�AT EXIS1 "I AS T"%�I Y�i'�Fl
<br /> 0
<br /> ANY DISCREPANCY SHALL BE CALLED "TO THE AT 1, Y 'A
<br /> A�N A N !A
<br /> AI`PLIr) N rfE FUT-IRF NOR DOE' j
<br /> S,S -T -EO N El"
<br /> -H THE WORK. _,A CO
<br /> PROCEEDING WITH UHING S'OSKS� AND Dfl VER,
<br /> ............................ ............. ......... ....... H,' ALL
<br /> ANS ma OF
<br /> NFO�ZYTY Ail- F SF P
<br /> .........
<br /> _!I KS YOU ASE bM',R:)IN','1y SR2ONGI.Y LNCQU A�,',LD 10
<br /> cRS5 A')N EN,,iNEE,`A Of "QUIR
<br /> 14M A OF:-V
<br /> LANDSCAPI 'ABLE AGENCIES FOR EXCAVATIONS OF' ', 1,7LI"
<br /> 2, GENERAL CON SHALL OBTAIN NECESSARY PERMIT FROM APPLIC Ci,005N, 10 INHPP_,E
<br /> ?LANs, FAF TRIJI-Y SU;',IE T OR S 57;?jC1`qG
<br /> A N F C Y' EH kAA
<br /> TRENCHES 5'--0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. S-�)RF AND LIVLR1 S"S I-W AT I.X,R 57AI'C,
<br /> x
<br /> HVEL6FaENT 1'NTRMATION,
<br /> NATIONALLY RECOGNIZED
<br /> 0 1 ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NAT
<br /> CONCRETE APPROACH AL CODES AND GOVERNING AUTHORITIES. UNDERGROUND STORAGE
<br /> CODES, LOC
<br /> CONCRETE APPROACH
<br /> TANK STANDARDS
<br /> TEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS REPRESENTATIVE PRIOR TO
<br /> 4� FUELING SYS
<br /> BEING PLACE BACK IN SERVICE. EVR PHASE 11 WITH ISD
<br /> V40 2008 SERIES <
<br /> 5. 'TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS I ORWARDED AND APPROVED BY ca
<br /> GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS APPLICABLE). CALIFORNIA MARKET
<br /> (a
<br /> 0
<br /> KETTLEMAN LAN E 6, PRIOR TO I UEL BEING PUMPED, STAT ION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES 0
<br /> N
<br /> SIPE ADDRESS� "I
<br /> OF TANK. CN
<br /> 7. REFERENCED CODES SHALL INCLUDE 2001 CBCo 2001 CFC, ARTICLE 79� 2001 CEC; 2001 CMC. 800 E KETTELMAN LN
<br /> LODI , CA
<br /> e
<br /> 8. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2001 CFC ARTICLE 87, FIRE EXTINGUISHERS SHALL BE
<br /> PROVIDED, THE AUTOMATIC FIRE SPRINKLER SYSTEM IS 1-0 REMAIN IN SERVICE AT ALL TIMES, UNDER NO
<br /> CIRCUMSTANCE SHALL 'THE FIRE SPRINKLER SYSTEM BE LEFT CUT OF SERVICE OVERNIGHT.
<br /> FACILM No. 02076
<br /> DESIGNED 3Y7 jp/0j AUJANCE &DM.
<br /> -------------------------------
<br /> CHEM BY: OV 3P REPIA:
<br /> TIK 1 --1 EVR PHASE 11 AND ISD UPGRADE SITE PLAN DRAWN BY: ALLIANCE PIA:
<br /> ip
<br /> N
<br /> TIK21 DISPENSER EVR PHASE 11 HANGING HARDWARE & ISD WRSAON: PR CT NO: 00
<br /> n
<br /> SENSORS, INSTALLATION AND EQUIPMENT
<br /> BCE #13412
<br /> T11<3---1 NEW VEEDER--ROOT PANEL MONITORING WIRING DETAILS (EVR
<br /> DRAWING TI-R.E�
<br /> PHASE 11 RETROFIT' PROGRAM)
<br /> TIQ ELECTRICAL FUELING WIRING DETAILS I-OR VEEDER--ROOT & m
<br /> EVR PHASE 11 AND ISD UPGRADE SITE PLAN ER PKME 11 AND ISD
<br /> -TYPICAL TURBINE SEF--UP (E.VR PHASE 11 RETROFIT PROGRAM)
<br /> UPGRADE SITE PLAN
<br /> cn
<br /> f-1--
<br /> SCALE; 1"=10'-O" -nON _cY
<br /> DRAWING DISCLAIMER NOTE AOMD INFORMA
<br /> THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, NO, FUELING POSITIONS: 8 SHFET NO:
<br /> Call ToIll Free
<br /> 0 5 10 20 SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO, GASOLINE NOZZLES: 8
<br /> "1 (888) 258-0808 DOES NOT WARRANT THE ACTUAL L.00ATION OF PROPERTY LINES AND NO, DIESEL N0ZZL_ES�,:_D1 0
<br /> F
<br /> SETBACKS. IF IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO
<br /> TWO
<br /> 11 d Ey
<br /> -Y LINES AND SETBACK DISTANCES WHERE MAY
<br /> ION
<br /> WORKING DAYS VERIFY PROPER]
<br /> BEFOREYOU AFFECT THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT.
<br /> DIG
<br /> THE [DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY RIP (0(,,Ja 2'0,0 0 8 TK1 oil
<br /> FROM ARCHIVE RECORDS.
<br /> L
<br />
|