CLIENT-
<br /> PIPING LEGEND
<br /> EXISTING 2" F.G. DOUBLE WALL. PRODUCT PIPING
<br /> ...........
<br /> EXISTING 2" OR 3" F.G. SINGLE WALL VAPOR RECOVERY PIPING
<br /> EXISTING7 2" F.C. SINGLE WALL VENT PIPING ARCO
<br /> bp WEST COAST PRODLIUS,LLC
<br /> GENERAL, NOTES
<br /> ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. '-;UfiWCE WNAGEF,76ENTTiji
<br /> THE CONTRACTOR SHALL. MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD
<br /> FINISHES IN PLACE,
<br /> SECONDARY CONTAINMENT PIPING !S SHOWN BY NOTE ONLY, NOT GRAPHICAL..LY. ALL EXISTING PRODUCT
<br /> PIPING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE,
<br /> HEALY EVR PHASE 11 AND ISD UPGRADE INSTALLATION NOTES
<br /> CD
<br /> EXISFING (4) 10,000 GALLON DOUB! E WALL TANKS AND PIPING SYSTEMS TO REMAIN. THERE SHALL BE NO WORK
<br /> PERFORMED ON ANY BURIED PIPING AS A PART OF THIS SCOPE.
<br /> TIC
<br /> ............... .. ...... (:2D NOT USED T; �ZSITE ADAPT CONSULTANT-
<br /> L
<br /> EXISTING (4) WAYNE 3V580 MULTIPRODUCT DISPENSERS TO REMAIN, CONTRACTOR TO REMOVE ALL EXISTING DISPENSER Vf 71,
<br /> -- ---_-.- GHAU
<br /> 0
<br /> HANGING HARDWARE & ASSOCIATED EQUIPMENT IN ORDER TO INSTALL NEW EVR PHASE 11 EQUIPMENT PER CARIB
<br /> EXECUTIVE ORDER VR-202--E 171
<br /> CONTRACTOR TO INSTALL NEVI HEALY DISPENSER MOUNTED RETROFIT KIT WITH VP1000P VACUUM PUMP.
<br /> REMOVE AND REPLACE CONTRACTOR TO INSTALL NEV-j' HEALY VAC ASSISI' HOSES, SWIVELS NOZZLES & BREAK—AWAY ES.
<br /> VALV
<br /> (79DEXISTING MONITORING CONTRACTOR TO INSTALL NBM VEEDER ROOT ISD FLOW METERS AT ALL DISPENSERS, 0
<br /> CONSOLE CONTRACTOR TO PULL NEW MONITORING SENSOR CABLING THROUGH EXISTING CONDUIT 1�
<br /> CONTRACTOR TO RE—CONNECT ALL EXISTING ELECTRICAL CONDUITS AS REQUIRED. CO
<br /> 7
<br /> N G
<br /> CONTRACTOR TO INSTALL (1) NEW '/EEDER ROOT ISD PRESSURE SENSOR AT DISPENSER NEAREST THE TANKS.
<br /> 'LAND PLANNING AND DESIGN SPECIAUSTS'
<br /> Z F (:D CONTRACTOR INSTALL NEW VERTICAL CLEAN AIR SEPARATOR UNIT ON 4'--O"X4'--O"X8" MINIMUM 18215 72ND AVENUE SOUTH
<br /> AM/PM BUILDING THICK CONCRETE PAD. KENT, WASHINGTON 98032
<br /> (425) 251
<br /> —6222
<br /> QD CONTRACTOR TO MANIFOLD ALL EXISTING GASOLINE VENT RISERS & CONNECT 1- VENT LINE FROM HEALY TANK TO VENT
<br /> STACK MANIFOLD PER DETAILS. SLO,1E 1/8" PER FOOT FROM NEW HEALY CLEAN AIR SEPARATOR. CONTRACTOR TO
<br /> 0 -—--... VERIFY THAT EXISTING TANK VENTS ARE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING RE\A90N DESCRIPTION
<br /> (E) VENT RISERS 0 OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. INSTALL HEALY CLEAN AIR SEPARATOR TANK AND ASSOCIATED NO' .' DAIIE
<br /> ...................... PIPING AND FITTINGS PER NEW CAR3 EVR PHASE 11 STANDARDS AND E.O. VR-202—E. INSTALLATION SHALL BE PER
<br /> ..................... 0
<br /> CARB EO AND MANUFACTURERS INSTRUCTIONS. SEE DRAWING TK21 FOR DETAILS.
<br /> 3
<br /> NOTE: INSTALLATION SHALL ME E' THE STATE APPROVED INSTALLATION INSTRUCTIONS FOR THE HEALY
<br /> 0
<br /> C 91 SYSTEMS INCORPORATED CLEAN AIR SEPARATOR AND THE STATE APPROVED IN—STATE DIAGNOSTICS
<br /> INSTALL NEW HEALY CLEAN AIR SEE C)
<br /> INSTALLATION INSTRUCTIONS.
<br /> SEPARATOR TANK ON 4 x4 x8 5
<br /> TK21
<br /> CONCRETE PAD
<br /> SIP110N
<br /> CD CONTRACTOR TO INSTALL NEW CONCRETE FILLED BOLLARDS IN LOCATIONS SHOWN.
<br /> CONTRACTOR 1-0 REMOVE EXISTING VEEDER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT (TLS-350R)
<br /> -----------
<br /> 87
<br /> AL
<br /> PANEL AT THE EXISTING LOCATION, RE—LAND SENSOR WIRING IN NEW PANEL PER DETAILS PROGRAM TO PANEL
<br /> A9
<br /> MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOW METER, PRESSURE SENSOR & TANK ANNULAR
<br /> SPACES.
<br /> PRIMARY
<br /> INSTALL NEW BOLLARD VEEDER ROOT PANEL TO BE PROGRAKA )iED BY A CERTIFIED TECHNICIAN UPON COMPLETION OF UPGRADE AND PRIOR TO
<br /> (TYP. 2 PLCS.) 8 1
<br /> . .......... . .........
<br /> 0
<br /> PLACING EQUIPMENT BACK IN SER-M
<br /> (]DO WHERE EXISTING TURBINES SERVE !I� v MA" ER ',I,11D v �,vNF;udRA11JN, CONTRACTOR I'0 bUGH
<br /> 3T I-A c-
<br /> VEEDER ROOT AUTOMATIC TANK GAt", DETERMINES WHICH TURBINE IS STARTED AS THE MASTER BASED ON THE LEVEL
<br /> F PRODUCT IN THE TANKS. SEE TK3-2 FOR DETAILS
<br /> SECONDARY
<br /> RE 0
<br /> NEW ISD PRESSU
<br /> 2�l
<br /> 0 0 : I
<br /> SENSOR
<br /> HAL P.,,,QRUBB
<br /> 87
<br /> EXISTING WAYNE 3V/580 SINGLE HOSE
<br /> D1 CONTRACTOR TO PERFORM ALL REQI,flRED VAPOR RECOVERY TESTING PER GARB E.O. VR---202--E AND LOCAL AIR 614"'
<br /> PER SIDE BLENDING 3 PRODUCT POLLUTION CONTROL AUTHORITY AND FORWARD RESULTS TO OWNER AND TO JURISDICTION AS SPECIFIED IN THE PERMIT
<br /> 0
<br /> CONDITIONS,
<br /> MPD'S TO REMAIN. CONVERT
<br /> A 0
<br /> DISPENSERS VAPOR RECOVERY SYSTEM v V'
<br /> 6/30/o!
<br /> 'TO HEALY EVR PHASE 11 WITH ISD (::12—) NO NEW ELECTRICAL LOADS ARE BE�NG INTRODUCED AS A RESULT OF THIS PROJECT. CONTRACTOR TO ENSURE THAT
<br /> 0 (TYP� OF 4) ALL NEW RETRO—FIT WORK PERFORMED ON THE EXISTING DISPENSERS SHALL BE IN CONFORMANCE AND MEETS THE v I
<br /> 0 REQUIREMENTS OF CEC 2004 SECTI1)N 514 AS SPECIFIED IN THE PERMIT CONDITIONS,
<br /> F,
<br /> FJ 1]
<br /> THE RECIPIENT OF THESE MATFRIALS UNDERSTANDS THAT
<br /> CONTRACTOR 1-0 FIELD VERIFY THE INSTALLATION OF (1) FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC WITHIN
<br /> COPYRIGHT IN PIE MATER ALS IS OWNED BY BP, AND ALSO,
<br /> N
<br /> THAT THE MAIERIALS CONTAI PRIOIJ.:GED AND CONFIDENTIAL
<br /> LOCATION OF 75' TO 20' OF TFiE T4NKS, I
<br /> BUSINESS NFORMATION OF BP� ACCORDINGLY, THE
<br /> RECI PIENT AGREES TO RETAIN THESE MATERIALS IN STRICT
<br /> CONFIDENCE AND AGREES NOT TO DISCLOSE THESE c
<br /> MATERIALS TO ANY OTHER PARTY AND FURTIIER AGREES
<br /> NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT
<br /> AGREES 10 USE THE MAIERIAIS ONLY FOR THE LIMITED
<br /> PURPOSE FOR WICH BP HAS MADE PIE MATERIALS GO
<br /> AVAILABLE. AND RECIPIENT AGREES 10 RETURN ALL 0-
<br /> COMPLIANCE NOTE."IS MATERIALS I'D 3P EVTHER UPON COMPLETON OF TTIE m
<br /> INTENDED PURPOSE OR UPON THE REQUEST OF BP,
<br /> WHICHEVER COMES FIRST,
<br /> 1� ALL DIMENSIONS AND CONDIT1014S SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. 3P DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR x
<br /> ANY DISCREPANCY SHALL BE C,�Q.LED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PETROLrUM STORAGE AND DISPENSING ARE COMPLIANT WTH N
<br /> THEY MAY BE
<br /> 0 PROCEEDING WITH THE WORK, ALL I-EGAL REQUIREMENTS THAT EXIST OR AS U-1
<br /> APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A
<br /> FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED .14
<br /> LANDSCAP CONFORMITY WTH ITIESE PLANS WILL BE FREE OF ALL
<br /> I TO §
<br /> LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGE
<br /> CONSULT WTH A FUEUNC STATON ENGINEER OF YOUR 0
<br /> CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE
<br /> PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE
<br /> TRENCHES 5*--0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. STORAGE AND DEUVFRY SYSTEM AT YOUR STATION.
<br /> 2. GENERAL CONTRACTOR SHALL (BTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF'
<br /> VELOPMENT INFORMATION:
<br /> CONCRETE APPROACH 0 3. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED
<br /> CONCRETE APPROACH CODES, LOCAL CODES AND GOVERNING AUTHORITIES,
<br /> UNDERGROUND STORAGE
<br /> 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS REPRESENTATIVE PRIOR TO TANK STAN DAR DS
<br /> BEING PLACE BACK IN SERWICE
<br /> EVR PHASE 11 WITH ISD V)
<br /> 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY V-8.0 2008 SERIES
<br /> GOVERNING AGENCY PRIOR 'TO FANK SYSTEM BEING PLACED IN OPERATION (AS APPLICABLE),
<br /> CALIFORNIA MARKET
<br /> KETTLEMAN LANE
<br /> co
<br /> 6. PRIOR TO FUEL BEING PLIMPE�',, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES 0
<br /> OF TANK. SITE ADDREM 0
<br /> CN
<br /> 1�1
<br /> T REFERENCED CODES SHALL IN(LUDE 2001 CBC; 2001 CFC, ARTICLE 79; 2001 CEC; 2001 CMC� 800 E KETTELMAN I.N
<br /> E
<br /> LODI , CA 1�
<br /> 8. FIRE SAFETY DURING CONSTRW'OTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE
<br /> PROVIDED, THE AUTOMATIC FIRE", SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES, UNDER NO 0
<br /> CIRCUMSTANCE SHALL THE FlRi.�," SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT
<br /> FAC11.11TY No. 02076
<br /> 0
<br /> -jj'y7 jp/OV AWMM ZkDM:
<br /> I�MI�ED
<br /> --—------—---------
<br /> CHEM BY-, ov Bp REPM:
<br /> DRAIAW BY: AWANCE PM:
<br /> jp 0
<br /> VM90W PRUCT Na U,
<br /> V-8.0
<br /> BCE #13412
<br /> EVR PHASE 11 AND ISD UPGRADE SITE PLAN
<br /> E� _T�
<br /> : i PII=,I O$—Opp a-
<br /> SCALE EVR PHASE 11 AND ISD cc
<br /> 0
<br /> UPGRADE SITE PLAN 0
<br /> DRAWING DISCLAIMER NOTE AOMD INFORMATION
<br /> 0 5 10 20 r
<br /> -2
<br /> THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, SHEFT NQ
<br /> Call Toll Free NO. FUELING POSITIONS: 8 .......
<br /> SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO, GASOLINE NOZZLES: 8 c
<br /> 1 (888) 258-0808 DOES NOT WARRANT THE ACTUAL LOCATION OF PROPERTY I-INES AND NO. DIESEL NOZZLES: 0
<br /> TWO SETBACKS. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO
<br /> E
<br /> WORKING DAYS VERIFY PROPERTY LINES AND SETBACK DISTANCES WHERE THEY MAY
<br /> BEFORE YOU
<br /> AFFECT THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT,
<br /> IEB
<br /> DIG
<br /> THE DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY BP
<br /> FROM ARCHIVE RECORDS, TK1 ml 0
<br /> 0