Laserfiche WebLink
CLIENT- <br /> PIPING LEGEND <br /> EXISTING 2" F.G. DOUBLE WALL. PRODUCT PIPING <br /> ........... <br /> EXISTING 2" OR 3" F.G. SINGLE WALL VAPOR RECOVERY PIPING <br /> EXISTING7 2" F.C. SINGLE WALL VENT PIPING ARCO <br /> bp WEST COAST PRODLIUS,LLC <br /> GENERAL, NOTES <br /> ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. '-;UfiWCE WNAGEF,76ENTTiji <br /> THE CONTRACTOR SHALL. MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD <br /> FINISHES IN PLACE, <br /> SECONDARY CONTAINMENT PIPING !S SHOWN BY NOTE ONLY, NOT GRAPHICAL..LY. ALL EXISTING PRODUCT <br /> PIPING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE, <br /> HEALY EVR PHASE 11 AND ISD UPGRADE INSTALLATION NOTES <br /> CD <br /> EXISFING (4) 10,000 GALLON DOUB! E WALL TANKS AND PIPING SYSTEMS TO REMAIN. THERE SHALL BE NO WORK <br /> PERFORMED ON ANY BURIED PIPING AS A PART OF THIS SCOPE. <br /> TIC <br /> ............... .. ...... (:2D NOT USED T; �ZSITE ADAPT CONSULTANT- <br /> L <br /> EXISTING (4) WAYNE 3V580 MULTIPRODUCT DISPENSERS TO REMAIN, CONTRACTOR TO REMOVE ALL EXISTING DISPENSER Vf 71, <br /> -- ---_-.- GHAU <br /> 0 <br /> HANGING HARDWARE & ASSOCIATED EQUIPMENT IN ORDER TO INSTALL NEW EVR PHASE 11 EQUIPMENT PER CARIB <br /> EXECUTIVE ORDER VR-202--E 171 <br /> CONTRACTOR TO INSTALL NEVI HEALY DISPENSER MOUNTED RETROFIT KIT WITH VP1000P VACUUM PUMP. <br /> REMOVE AND REPLACE CONTRACTOR TO INSTALL NEV-j' HEALY VAC ASSISI' HOSES, SWIVELS NOZZLES & BREAK—AWAY ES. <br /> VALV <br /> (79DEXISTING MONITORING CONTRACTOR TO INSTALL NBM VEEDER ROOT ISD FLOW METERS AT ALL DISPENSERS, 0 <br /> CONSOLE CONTRACTOR TO PULL NEW MONITORING SENSOR CABLING THROUGH EXISTING CONDUIT 1� <br /> CONTRACTOR TO RE—CONNECT ALL EXISTING ELECTRICAL CONDUITS AS REQUIRED. CO <br /> 7 <br /> N G <br /> CONTRACTOR TO INSTALL (1) NEW '/EEDER ROOT ISD PRESSURE SENSOR AT DISPENSER NEAREST THE TANKS. <br /> 'LAND PLANNING AND DESIGN SPECIAUSTS' <br /> Z F (:D CONTRACTOR INSTALL NEW VERTICAL CLEAN AIR SEPARATOR UNIT ON 4'--O"X4'--O"X8" MINIMUM 18215 72ND AVENUE SOUTH <br /> AM/PM BUILDING THICK CONCRETE PAD. KENT, WASHINGTON 98032 <br /> (425) 251 <br /> —6222 <br /> QD CONTRACTOR TO MANIFOLD ALL EXISTING GASOLINE VENT RISERS & CONNECT 1- VENT LINE FROM HEALY TANK TO VENT <br /> STACK MANIFOLD PER DETAILS. SLO,­1E 1/8" PER FOOT FROM NEW HEALY CLEAN AIR SEPARATOR. CONTRACTOR TO <br /> 0 -—--... VERIFY THAT EXISTING TANK VENTS ARE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING RE\A90N DESCRIPTION <br /> (E) VENT RISERS 0 OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. INSTALL HEALY CLEAN AIR SEPARATOR TANK AND ASSOCIATED NO' .' DAIIE <br /> ...................... PIPING AND FITTINGS PER NEW CAR3 EVR PHASE 11 STANDARDS AND E.O. VR-202—E. INSTALLATION SHALL BE PER <br /> ..................... 0 <br /> CARB EO AND MANUFACTURERS INSTRUCTIONS. SEE DRAWING TK2­1 FOR DETAILS. <br /> 3 <br /> NOTE: INSTALLATION SHALL ME E' THE STATE APPROVED INSTALLATION INSTRUCTIONS FOR THE HEALY <br /> 0 <br /> C 91 SYSTEMS INCORPORATED CLEAN AIR SEPARATOR AND THE STATE APPROVED IN—STATE DIAGNOSTICS <br /> INSTALL NEW HEALY CLEAN AIR SEE C) <br /> INSTALLATION INSTRUCTIONS. <br /> SEPARATOR TANK ON 4 x4 x8 5 <br /> TK2­1 <br /> CONCRETE PAD <br /> SIP1­10N <br /> CD CONTRACTOR TO INSTALL NEW CONCRETE FILLED BOLLARDS IN LOCATIONS SHOWN. <br /> CONTRACTOR 1-0 REMOVE EXISTING VEEDER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT (TLS-350R) <br /> ----------- <br /> 87 <br /> AL <br /> PANEL AT THE EXISTING LOCATION, RE—LAND SENSOR WIRING IN NEW PANEL PER DETAILS PROGRAM TO PANEL <br /> A9 <br /> MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOW METER, PRESSURE SENSOR & TANK ANNULAR <br /> SPACES. <br /> PRIMARY <br /> INSTALL NEW BOLLARD VEEDER ROOT PANEL TO BE PROGRAKA )iED BY A CERTIFIED TECHNICIAN UPON COMPLETION OF UPGRADE AND PRIOR TO <br /> (TYP. 2 PLCS.) 8 1 <br /> . .......... . ......... <br /> 0 <br /> PLACING EQUIPMENT BACK IN SER-M <br /> (]DO WHERE EXISTING TURBINES SERVE !I� v MA" ER ',I,11D v �,vNF;udRA11JN, CONTRACTOR I'0 bUGH <br /> 3T I-A c- <br /> VEEDER ROOT AUTOMATIC TANK GAt", DETERMINES WHICH TURBINE IS STARTED AS THE MASTER BASED ON THE LEVEL <br /> F PRODUCT IN THE TANKS. SEE TK3-2 FOR DETAILS <br /> SECONDARY <br /> RE 0 <br /> NEW ISD PRESSU <br /> 2�l <br /> 0 0 : I <br /> SENSOR <br /> HAL P.,,,QRUBB <br /> 87 <br /> EXISTING WAYNE 3V/580 SINGLE HOSE <br /> D1 CONTRACTOR TO PERFORM ALL REQI,flRED VAPOR RECOVERY TESTING PER GARB E.O. VR---202--E AND LOCAL AIR 614"' <br /> PER SIDE BLENDING 3 PRODUCT POLLUTION CONTROL AUTHORITY AND FORWARD RESULTS TO OWNER AND TO JURISDICTION AS SPECIFIED IN THE PERMIT <br /> 0 <br /> CONDITIONS, <br /> MPD'S TO REMAIN. CONVERT <br /> A 0 <br /> DISPENSERS VAPOR RECOVERY SYSTEM v V' <br /> 6/30/o! <br /> 'TO HEALY EVR PHASE 11 WITH ISD (::12—) NO NEW ELECTRICAL LOADS ARE BE�NG INTRODUCED AS A RESULT OF THIS PROJECT. CONTRACTOR TO ENSURE THAT <br /> 0 (TYP� OF 4) ALL NEW RETRO—FIT WORK PERFORMED ON THE EXISTING DISPENSERS SHALL BE IN CONFORMANCE AND MEETS THE v I <br /> 0 REQUIREMENTS OF CEC 2004 SECTI1)N 514 AS SPECIFIED IN THE PERMIT CONDITIONS, <br /> F, <br /> FJ 1] <br /> THE RECIPIENT OF THESE MATFRIALS UNDERSTANDS THAT <br /> CONTRACTOR 1-0 FIELD VERIFY THE INSTALLATION OF (1) FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC WITHIN <br /> COPYRIGHT IN PIE MATER ALS IS OWNED BY BP, AND ALSO, <br /> N <br /> THAT THE MAIERIALS CONTAI PRIOIJ.:GED AND CONFIDENTIAL <br /> LOCATION OF 75' TO 20' OF TFiE T4NKS, I <br /> BUSINESS NFORMATION OF BP� ACCORDINGLY, THE <br /> RECI PIENT AGREES TO RETAIN THESE MATERIALS IN STRICT <br /> CONFIDENCE AND AGREES NOT TO DISCLOSE THESE c <br /> MATERIALS TO ANY OTHER PARTY AND FURTIIER AGREES <br /> NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT <br /> AGREES 10 USE THE MAIERIAIS ONLY FOR THE LIMITED <br /> PURPOSE FOR WICH BP HAS MADE PIE MATERIALS GO <br /> AVAILABLE. AND RECIPIENT AGREES 10 RETURN ALL 0- <br /> COMPLIANCE NOTE."IS MATERIALS I'D 3P EVTHER UPON COMPLETON OF TT­IE m <br /> INTENDED PURPOSE OR UPON THE REQUEST OF BP, <br /> WHICHEVER COMES FIRST, <br /> 1� ALL DIMENSIONS AND CONDIT1014S SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. 3P DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR x <br /> ANY DISCREPANCY SHALL BE C,�Q.LED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PETROLrUM STORAGE AND DISPENSING ARE COMPLIANT WTH N <br /> THEY MAY BE <br /> 0 PROCEEDING WITH THE WORK, ALL I-EGAL REQUIREMENTS THAT EXIST OR AS U-1 <br /> APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A <br /> FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED .14 <br /> LANDSCAP CONFORMITY WTH ITIESE PLANS WILL BE FREE OF ALL <br /> I TO § <br /> LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGE <br /> CONSULT WTH A FUEUNC STATON ENGINEER OF YOUR 0 <br /> CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE <br /> PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> TRENCHES 5*--0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. STORAGE AND DEUVFRY SYSTEM AT YOUR STATION. <br /> 2. GENERAL CONTRACTOR SHALL (BTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF' <br /> VELOPMENT INFORMATION: <br /> CONCRETE APPROACH 0 3. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED <br /> CONCRETE APPROACH CODES, LOCAL CODES AND GOVERNING AUTHORITIES, <br /> UNDERGROUND STORAGE <br /> 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS REPRESENTATIVE PRIOR TO TANK STAN DAR DS <br /> BEING PLACE BACK IN SERWICE <br /> EVR PHASE 11 WITH ISD V) <br /> 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY V-8.0 2008 SERIES <br /> GOVERNING AGENCY PRIOR 'TO FANK SYSTEM BEING PLACED IN OPERATION (AS APPLICABLE), <br /> CALIFORNIA MARKET <br /> KETTLEMAN LANE <br /> co <br /> 6. PRIOR TO FUEL BEING PLIMPE�',, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES 0 <br /> OF TANK. SITE ADDREM 0 <br /> CN <br /> 1�1 <br /> T REFERENCED CODES SHALL IN(LUDE 2001 CBC; 2001 CFC, ARTICLE 79; 2001 CEC; 2001 CMC� 800 E KETTELMAN I.N <br /> E <br /> LODI , CA 1� <br /> 8. FIRE SAFETY DURING CONSTRW'OTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE <br /> PROVIDED, THE AUTOMATIC FIRE", SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES, UNDER NO 0 <br /> CIRCUMSTANCE SHALL THE FlRi.�," SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT <br /> FAC11.11TY No. 02076 <br /> 0 <br /> -jj'y7 jp/OV AWMM ZkDM: <br /> I�MI�ED <br /> --—------—--------- <br /> CHEM BY-, ov Bp REPM: <br /> DRAIAW BY: AWANCE PM: <br /> jp 0 <br /> VM90W PRUCT Na U, <br /> V-8.0 <br /> BCE #13412 <br /> EVR PHASE 11 AND ISD UPGRADE SITE PLAN <br /> E� _T� <br /> : i PII=,I O$—Opp a- <br /> SCALE EVR PHASE 11 AND ISD cc <br /> 0 <br /> UPGRADE SITE PLAN 0 <br /> DRAWING DISCLAIMER NOTE AOMD INFORMATION <br /> 0 5 10 20 r <br /> -2 <br /> THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, SHEFT NQ <br /> Call Toll Free NO. FUELING POSITIONS: 8 ....... <br /> SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO, GASOLINE NOZZLES: 8 c <br /> 1 (888) 258-0808 DOES NOT WARRANT THE ACTUAL LOCATION OF PROPERTY I-INES AND NO. DIESEL NOZZLES: 0 <br /> TWO SETBACKS. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO <br /> E <br /> WORKING DAYS VERIFY PROPERTY LINES AND SETBACK DISTANCES WHERE THEY MAY <br /> BEFORE YOU <br /> AFFECT THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT, <br /> IEB <br /> DIG <br /> THE DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY BP <br /> FROM ARCHIVE RECORDS, TK1 ml 0 <br /> 0 <br />