Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED Fqp <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 3) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> ARCO 02076 <br /> BUSINESS SITE ADDRESS 800 E KETTLEMAN LN LODI 103. BUSINESS SITE CITY 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b the a ui ment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed b ualified gr onnel.[23 CCR§2632,2634,2638,26411 <br /> Y...................9......P....................................................................................................................................................Y...................................................................... ....................... ..... .........................................P..................................Y............................ ................ .. ......... <br /> .. ... ............. .. 9.. P....... .. ........... <br /> UIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER490-3a. <br /> MONITORING EQUIPMENT (Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 490-4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> (Check <br /> ap i) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5_ <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350R 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-407 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl.[z3 CCR§2643] ago-u. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERago-la. <br /> g•P• g•P• (Specify)- 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ......................... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490 0-21. <br /> ........................................................................................................................................................................................................................ <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER( PecifY)S ago-za. <br /> Q .... <br /> ❑ 99.OTHER S eci ): 490-27 0-27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) tlatteck tll <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [21 CCR§2 36] SECONDARY CONTAINMENT IS: ® a.DRY El b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder Root 490-30. MODEL#: TLS-35OR 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-323 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ...... ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS FF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S): 490-37MODEL#(S): 490-38. <br /> ................................................................................................................................................ ....................................... .............................. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):Veeder Root 490-40. MODEL#(S): PLLD 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-44. <br /> ......................................................................................................................................... <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> 90-46, <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS eci 447. <br /> ............................................................................._Q...................................-....................................................................................................................................................................................................................................................................................p.........�...�..... ...._490-4Z:............. <br /> ❑ 5.VISUAL PIPE MONITORING. ago-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> 'Allowed for monitorin of unburied emer enc enerator fuel i in onl er HSC 25281.5 )3 <br /> ...................................................................................................................................................................................................................................................................................................................................................................8............. <br /> a........x..s................................. ......s..........x. .....................§.....................ro..c...�........................... <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 490-50. <br /> ............................................................................................................. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> .................................................................................................................................................................................................................................................................................................................................................................................._........................................................................................................................................................-....................4.................... <br /> ❑ 99.OTHER(Specify) 90-sz. <br /> 490-53. <br /> •___nnnni o_�_..___r.__a___�__._.a_�a___ n.,__1 _r X <br />