Laserfiche WebLink
SWRCB,•January 2002 • • Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: D <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested: <br /> Test Method Developed By: F-1 Spill Bucket Manufacturer Industry Standard F-1 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: FI Pressure Vacuum 1XI Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Bos# 1 SUP FILL Spill Bos# 2 REG FILL S)ill Bos# 3 REG FILL <br /> I Spill Bos# 4 REG FILL <br /> Bucket Diameter: 12 12 12 12 <br /> Bucket Depth: 10 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 5 <br /> starting test: <br /> Test Start Time: 1330 1330 1330 1330 <br /> Initial Reading(RI ): 9.75 9.75 9.75 9.75 <br /> Test End Time: 1430 1430 1430 1430 <br /> Final Reading(RF ): 9.75 9.7S 9.75 9.75 <br /> Test Duration: 60 MINS. 60 MINS. 60 MINS. 60 MINS. <br /> Change in Reading(R F 0 0 0 0 <br /> Pass/Fail Threshold or P P P P <br /> Criteria: <br /> Test Result: Pass DFailPass Fail El Pass El Fail Pass El Fail <br /> Li <br /> Comments - (include in formation on repairs made prior to testing, and recommended follow-up for failed tests) <br />