My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO 2006 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 4:57:32 PM
Creation date
11/5/2018 3:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2007
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\800\PR0231349\COMPLIANCE INFO 2006 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2007
QuestysRecordDate
2/16/2018 6:39:17 PM
QuestysRecordID
3798594
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BP Emergency Stop Switch Test <br /> WO#/ Date 2248888 05/02/2007 <br /> SVB# 02076 <br /> Street address 800 KETTLEMAN LN PTO N-85 <br /> City, ST LODI, CA <br /> Total Time Testing E-Stop 15 MINS. <br /> Location of E-Stop <br /> Shut Down <br /> Turbine (Y/N) Dispenser(Y/N) Comments/Repairs <br /> Outside Wall Yes Yes <br /> Inside Wall Yes Yes <br /> Other <br /> Did ESO function correctly (remove 220 from both sides of the relay)? YES NO <br /> Test Result (PASS / FAIL) PASS <br /> If the test FAILS call the Elite Customer Solutions Center Immediately. <br /> Date/Time/Name at Help Desk notified <br /> If the test FAILS teach the site personnel alternative emergency shut down procedure <br /> (e.g. Circuit breakers, pump controller) <br /> Date/Time/Name at employee trained <br /> If system does not turn back on when the E-Stop is reactivated,the site personell are to contact the BP Help Desk. The <br /> Help desk will talk them through resetting the E-Stop and/or issue a 4 hour contractor response. <br /> Technician Signature / Date . 05/02/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.