Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MSO. <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) M52. <br /> PANEL MANUFACTURER: Veeder Root MODEL#: TLS 350 <br /> M" <br /> LEAK SENSOR MANUFACTURER: Veeder Root M53 MODEL#(S): 794-380-323 Mss. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO <br /> ❑ <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES b.NO M16.M57. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK M59. <br /> ASSEMBLY MANUFACTURER: Mss. MODEL#(S): Mho. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 4.NO DISPENSERS M61. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION M70. <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> M80, <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> I. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)* <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of MM/DD/YY) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. 171 SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" M8 1, <br /> 99. ❑ OTHER(Specify): <br /> ith all of the above documents relevant to their job duties and can access those documents when needed. <br /> Personnel with UST monitoring responsibilities are familiar w <br /> By 1/1/2005,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July 1, <br /> 2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This training <br /> will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION M85. <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): <br /> *Monitoring systems manual maintained by contracted,licensed pump and tank technicians. <br /> Best Management Practices are maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). <br /> X. PERSONNEL RESPONSIBILITIES <br /> THE FACILITY OPERATOR DESIGNATED IN SECTION XI BELOW IS RESPONSIBLE FOR PEFORMING MONITORING. BP WEST COAST PRODUCTS <br /> LLC IS RESPONSIBLE FOR MAINTAINING AND TESTING ALL MONITORING EQUIPMENT. <br /> XI. OWNER/OPERATOR SIGNATURE <br /> tCERTIFICATION:I ertify a e information provided herein is true and accurate to the best of my knowledge. M91. <br /> /OPERAT AT REPRESENTING DATE: <br /> ❑Owner M90. ' <br /> ®Operator <br /> M92 M93. <br /> OWNER/OPERATOR NAME(pnn OWNER/OPE TOR ITLE: <br /> PROMOD K TREHAN FRANCHISEE <br /> (Agency Use Only) This plan has been reviewed and: El Approved Approved With Conditions ❑Disapproved <br /> Date: <br /> Local Agency Signature: <br /> Comments/Special Conditions: <br /> Page 2 of 5 <br /> Arco#02076,Belshire Environmental Services <br />