Laserfiche WebLink
�• z , <br /> Sampling is required and must be completed under EHD permit. (CCR Title <br /> 23 section 2660 (1) (k)) <br /> 5. Any tank and line monitoring system to be proposed must be found listed in <br /> LG113#, and must meet the requirements of CCR Title 23 section 2666. This <br /> monitoring system must also provide pump shutdown upon leak detection. <br /> Per CCR Title 23 section 2660 (n) which refers to CCR Title 23 section 2635 <br /> (2A) (213) will apply to any corrosion protection system. <br /> 6. Dispenser pans are required if any work is done to the piping and dispenser <br /> systems. <br /> If you have any questions regarding this matter, please contact me at (209)468- <br /> 3446. <br /> Karen Furst, M.D., M.P.H. <br /> Health Officer <br /> Doug Wilson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> D W/dw <br /> cc Bill Zabca, ARCO <br />