My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
0
>
2300 - Underground Storage Tank Program
>
PR0541126
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:42:29 PM
Creation date
11/5/2018 4:20:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541126
PE
2361
FACILITY_ID
FA0023550
FACILITY_NAME
CAL TRANS (SPRR PROJECT)
STREET_NUMBER
0
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
LAFAYETTE ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LAFAYETTE\0\PR0541126\COMPLIANCE INFO 1985-1986.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA AKLY STATEMENT 0 <br /> DEPARTMENT OF TRANSPORTATION OF WORKING DAYS j �� � 7-o File Index No. 27 <br /> FORM �� W / ` <br /> HC-146 ) �� REPORT NO <br /> (REV 9.79) / <br /> TQk At k, aT IS RECEIVED DEC 0 9 1985 �ontroctor <br /> The following statement shows the number of working days charged to your contract for the week ending :1 Ile v"' r <br /> Working Days <br /> Non-Working No Work <br /> Date Day Weather,Weather Conditions or Working Days Done on <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Ve[ Mon. 2 1 ti <br /> Tue. y <br /> Wed. .s <br /> Thur. Sy <br /> Fri. <br /> Daysthis week W--------------------------------------------- --------------------------------- <br /> Days previously reported-------- ---------. _ -...._.....................----------- _--•— 0 <br /> Total days to dale --------------------------------------------------- ---- <br /> CCO Numbers Dari Approved <br /> TIME EXTENSIONS (Note 3) <br /> CGO Other <br /> Days this report___-------------------------------................_-------------------- <br /> Days <br /> ----Days previously reported---------------------------------------------------------------------------- <br /> Totaldays to data,- - ..................... .. . --...........------------ - --------------------------------------------------- <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Day Date <br /> of Days (Note 5) <br /> z <br /> 1. Dale Contras approved by Attorney GanaraL_______________—r._______ <br /> t <br /> 2. Working days specified in contras.--___.____.a.._..__-_- --------------------- --._.... <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)------__-_._.___�____-�..� « <br /> 4. Tocol time extension days approved to date (CCO plus4. x - <br /> 5. Total non-working days to date (Note 4)----------- •-•--------------------_- .___—_------- � <br /> 6. Sub Total (Line 4 plus Line 5)----------------------.......------------------ ----—----——--------------------------• <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) ——------- <br /> 8. Revised working days for contras (Line 2 plus Line 4) <br /> 9. Total working days to <br /> 10. WORKING DAYS REMAINING (Line 8 minus Line <br /> Controlling Operation(%) t` Z a fQK <br /> REMARKS: (Note 6) (Continue on reverse) <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- <br /> non of the statement; otherwise the statement shall be deemed to have been accepted by Resident Engineer <br /> the Contractor as correct. NOTE: All footnotes are on reverse side. <br /> air <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.