My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
0
>
2300 - Underground Storage Tank Program
>
PR0541126
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:42:29 PM
Creation date
11/5/2018 4:20:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541126
PE
2361
FACILITY_ID
FA0023550
FACILITY_NAME
CAL TRANS (SPRR PROJECT)
STREET_NUMBER
0
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
LAFAYETTE ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LAFAYETTE\0\PR0541126\COMPLIANCE INFO 1985-1986.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA AKLY STATEMENT 0 <br /> DEPARTMENT OF TRANSPORTATION OF WORKING DAYS <br /> rh'.r <br /> ! File Index No. 27 <br /> FORM 44 <br /> WG-its 1/A• /�yj REPORT NO <br /> (REV 9.79) ! 1... <br /> -�-� � �' <br /> T (o � Contractor <br /> The following statement shows the number of working days charged to your contract for the week ending De c - ?` f <br /> lf` <br /> Working Days <br /> Nan-Working No Work <br /> Date Day Weather,Weather Conditions or Working Days Done on <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Mon. <br /> Tue. <br /> 5 wed. �� r <br /> Thur, <br /> ;4 -7 Fri. <br /> Daysthis weak—------------------------__--.-. —----------------------- <br /> Days <br /> ---------------------Days previously reported------------------•-•------------------------_---„------•----------.------•--•------------- �• r <br /> Total days to date------- -------.--_.-------------.....................-- --—— -- --- <br /> CCO Numbers Days Approved <br /> TIME EXTENSIONS (Note 3) <br /> CCO Other <br /> Daysthis report- - ----------------------------------------------- - — ----- w — <br /> Days previously reported...........------------------------------------------------------------------- - --- — — <br /> Total days to date. C� <br /> Number Numbered Day <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION of Days (Note 5) 'Date <br /> 1. Date Contract approved by Attorney General-------------- <br /> 2. <br /> --•-.-----.2- Working days specified in contract------ ----_------.-..........-------------•---•-------- -- _ <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)_.-----._---_____. <br /> 4. Total time extension days approved to date (CCO plus other)-_---.-------------_------ " a <br /> - W., a. <br /> 3. Total non-working days to date (Note 4}.-_-----__--_..-____—_ — ___----------------- } a-- r s . <br /> b. Sub Total (Line 4 plus Line 5)-- ---------------------------------- -------------------------- ------------•---•-- <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Una b) <br /> B. Revised working days for contract(Line 2 plus Line 4) __- —_--.__._-_-__---- <br /> 9. Total working days to date----------- -—•-. .--- -- — --- .. ------------- e� <br /> 10. WORKING DAYS REMAINING (Line $minus Line 9)----•-- <br /> 1 r / <br /> j' <br /> Controlling Operafion(s Li <br /> REMARKS: (Nate 6) (Continue on reverse) <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- <br /> Pass of the statement, otherwise the statement shall be deemed to have been accepted by Resident npineer <br /> the Contractor as correct. NOTE: All footnotes are on reverse side. <br /> osp <br />
The URL can be used to link to this page
Your browser does not support the video tag.