STATE OF CALIFORNIA W&Y STATEMENT RECE Dq t <br /> DEPARTMENT OF TRANSP0RTATION "� s <br /> OF WORKING DAYS File Index Na. 27 <br /> FORM <br /> HC-146 10-SJ-4-817.4 REPORT NO 7 <br /> (1tfiY 9-79) <br /> �7 <br /> 1OA 514 <br /> TO 0. H e Materials aLContractor <br /> The following statement shows the number of working days charged to your contract for the week ending January 17, 1986 19 <br /> Working Days <br /> Non-Working No work <br /> Date Da Weather,Weather Conditions or •working Days Done on <br /> Y Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Jan 13 Mon. Rain 11 <br /> 14 Tue. 'het Grade_ I 1 <br /> Wed. Rain 1 <br /> 16 Thur. III 1 <br /> 17 Fri. Wet Grade <br /> 1 <br /> Daysthis week------------- _ - ---- —------------------------------ -- -------------------------------------------- O <br /> Days previously reported- - -- -- — - - - ---- -- --- -- - <br /> Totaldays to date.- --------------... ................. . - - -- --------------------- - - <br /> TIME EXTENSIONS CCO Numbers Days Approved <br /> (Note 3) CCO Other <br /> Daysthis report--.--.---- ------------_------------------------------------------ ----- -- — O O <br /> Days previously reported ._._.--------------------- _- --_-- -— - - -- - <br /> Totaldays to deft-------------------.---------------------------•--- - --..----.-_------------------------------------ <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Dayof Days (Note 5) Date <br /> 1. Date Contract approved by Attorney —....... r <br /> 2. Working days specified in contract--- Al <br /> a• cox <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)-----___--------------_----- _ <br /> 241 1-2 <br /> A. Total time extension days approved to date (CCO plus other)__ --_._.__.-.._____—........._-_-_._ <br /> 5. Total non-working days to date (Note 4)_-.-__ <br /> *. <br /> 6. Sub Total (Erse 4 plus Line 5)----_-------------------------------------•---------------_.---- <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Lirve ________-------------------------------- `. <br /> 2 4 2-1 <br /> S. Revised working days for contract (Line 2 plus Line 4)-� _------------------------ 45 <br /> --.--_. a <br /> 9. Total working days tedoh <br /> 10. WORKING DAYS REMAINING (Line 8 minus Line 9)------ <br /> Controlling <br /> )_Controlling Operations) Additiaml tests & backfill <br /> REMARKS: (Note 6) (Continue on reverse) <br /> R. Re Le san <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- <br /> nen of the statement; otherwise the statement shall be deemed to have been accepted by Resident Engineer <br /> fhe Contractor as correct. NOTE: All footnotes are on reverse side. <br /> 84 89199 <br />