My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAFAYETTE
>
0
>
2300 - Underground Storage Tank Program
>
PR0541126
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:42:29 PM
Creation date
11/5/2018 4:20:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541126
PE
2361
FACILITY_ID
FA0023550
FACILITY_NAME
CAL TRANS (SPRR PROJECT)
STREET_NUMBER
0
STREET_NAME
LAFAYETTE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
LAFAYETTE ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LAFAYETTE\0\PR0541126\COMPLIANCE INFO 1985-1986.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA W&LY STATEMENT 0 <br /> DEPARTMENT OF TRANSPORTATION �a S-,MP <br /> OF WORKING DAYS File Index Na. 27 <br /> HC1�-SJ- —817. 4 <br /> . 4s REPORT NO. 10 <br /> (REV 9-710) —A514 <br /> (REV <br /> To — _ 0 . 14_ M;;tPri a 1 g e, Contractor <br /> The following statement shows the number of working days charged to your contract for the week ending February 7, 19 8 <br /> • Working Days <br /> Non-Working No Work <br /> Date Day Weather,Weather Conditions or Working Days Done on <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Von 1h Mon. 1 <br /> Tue. 11 1 <br /> Wed. 11 1 <br /> Thur. 1f 1 <br /> Fri. it 1 <br /> Daysthis week------------------ -------------------------------------— -- - _ - <br /> Days previously reported--------- ----------_____--------__------------_-_ _----------__---- <br /> Totaldays to dote,__.........-----------_-----------------------------------------.......—------—---------- — - <br /> TIME EXTENSIONS <br /> CCO Numbers Days Approved <br /> (Note 9) CCO Other <br /> Days this report------------------------------- -- --------------- <br /> Days <br /> --Days previously reported--------------------------------------------------._ ------------_—----------— --- ----- <br /> Totaldays to date............. ..- ... ......... --- ------'—' --------------------------- -------------------------- <br /> Number Numbered Day <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION of Days (Note 5) Date <br /> 1. Date Contract approved by Attorney General----_---------- — <br /> 2. Working days specified in contract---__—_—_..—____ <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable).-.-__—..._._...__._..... — <br /> A. Total time extension days approved to date (CCO plus other)___—_____.._—-----------__________-_—____- 1 z <br /> 5. Total non-working days to date (Note 4)------------------__----_.__.---------------_ ------ <br /> 6. Sub Total (Line 4 plus Line S)........... .. ._...,._. . <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line 6) <br /> B. Revised working days for contras Line 2 plus Line 4 — ____--__ <br /> P. Total working days to <br /> 10. WORKING DAYS REMAINING (Line 8 minus Line <br /> Controlling Operation(*) Soil tests , backfill <br /> REMARKS: (Note 6) (Continue on reverse) <br /> rV <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- R. Lesan <br /> nese of the statement. otherwise the statement shall be deemed to have been accepted by Resident Engineer <br /> the Contractor as correct. NOTE: All footnotes are on reverse side. <br /> 84 89199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.