STATE OF CALIFORNIA &KLY STATEMENT R E CI >F E D %P r 0 1986 <br /> DEPARTMENT OF TRANSPORTATION OF WORKING DAYS a c. STAMP File Index No. 27 <br /> FORM s „ .�� REPORT NO 18 <br /> (REV e•70f 10A514 <br /> To ©• H. Materials Contractor <br /> The following statement shows the number of working days charged to your contract for the week ending April 4 , , 19 86 <br /> Working Days <br /> Non-Working No Work <br /> Date Day Weather,Weather Conditions or Working Days Done on <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> March 31 Mon. Fair 1 <br /> April 1 Tae. It <br /> 1 <br /> 2 Wed. tt 1 <br /> 3 Thur. rt 1 <br /> 4 Fri. Contract T�c ep ted 1 <br /> Daysthis week----------- —».---------------—........- --- -- — -------- —— ---- <br /> 4 51 <br /> Days previously reported------------- - ..---------------------------- ----- — — -—---- - 7 <br /> 39 51 <br /> Totaldays to date........................ -.._-------------------------------—- -- .. --- ——------- <br /> CCO Numbers Days Approved <br /> TIME EXTENSIONS (Note 3) <br /> CCO Other <br /> Days this report----_---------------------------- _ — _ -- -- — <br /> Dayspreviously reported..----- -- - - -- ...------------.-......,......------------------------------ `------•-------------------------------------- <br /> Totaldays to date........ ... ........ ... .. ..... - - - - .. -.... --------------- ------------—- --------------------•------------------------ <br /> Number Numbered Day <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION of Days (Note 5) Date <br /> � <br /> 1. Date Contract approved by Attorney General_______________--_—__.—.—_ <br /> 777T r) <br /> 1: <br /> 2. Working days specified in contract----��-- <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)----____---- A <br /> A. Total time extension days approved to date(CCO plus <br /> } � �$a � $ <br /> 5. Total non-working days to date {Nate A} — - --- -- - - sh <br /> 6. Sub Total (Lina A plus Line 5)---------------------------_---._. .-_--�.----�__----___-___._- <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Lina 6) -------------- -- � <br /> 8. Revised working days for contract (Line 2 plus Line AD ---------- - o <br /> 9. Total working days to dale--_-- ---�--------- _�__.-__. .. �¢�r • ' <br /> 10. WORKING DAYS REMAINING(Line 8 minus Line <br /> Controlling Operation(s), <br /> REMARKS: (Note 6) (Continue on reverse) <br /> Contract accepted complete 4-4-56 <br /> / j <br /> i <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- <br /> R. R. ecuc:n <br /> ness of the statement, otherwise the statement shall be deemed to have been accepted by Resident Engineer <br /> the Contractor as correct. NOTE: All footnotes are on reverse side. <br /> 84 89198 <br /> P^kl'rn A rTe%D nv <br />